My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/26/2026
Ramsey
>
Public
>
Agendas
>
Council
>
2026
>
Agenda - Council - 05/26/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 2:51:37 PM
Creation date
5/27/2026 8:48:56 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/26/2026
Supplemental fields
Year
%(Da
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session <br />Meeting Date: <br />05/26/2026 <br />Primary Strategic Plan Initiative: Promote economic growth and development. <br />7. 4. <br />Title: <br />Adopt Resolution #26-127 Approving Purchase Agreement, Right of Re -Entry Agreement and Sale of City <br />Property to LH Road, LLC <br />Purpose/Background: <br />The City Council may choose to go into closed session pursuant to Minnesota Statutes section 13D.05, <br />subdivision 3(c)(3) to consider offers or counteroffers for the purchase or sale of real or personal property. If the <br />city Council chooses to enter into to closed session the statute and reason above needs to be referenced along with <br />legal description (Tract B, Registered Land Survey No. 251) and the Anoka County Tax ID number <br />27-32-25-41-0025. <br />The purpose of this case is to consider the sale Tract B, Registered Land Survey No. 251 to LH Road, LLC <br />(Wildlife Research Center) to expand business operations. The business expansion project includes two buildings <br />that will be built in sequence. The first building to be constructed is a 13,500 SF warehouse building that will be <br />constructed fully on Tract B. This project will commence this summer if approved. The second building is a <br />36,000 SF addition onto its existing 40,000 SF building for warehousing, shipping and manufacturing. The total <br />project costs are estimated to be approximately 5.1 Million. The second building needs to commence construction <br />during the "non -busy" season for Wildlife Research Center which is planned for December of 2026 pending <br />approval of the land sale. In the event that materials, the platting or city approvals are not obtained on time, the <br />36,000 SF Building expansion could be pushed to December of 2027. Only the 13,500 SF building on Tract B <br />will be subject to the terms and conditions of the Right of Re -Entry Agreement proposed. <br />Lot Conditions / Sale Price <br />Currently the site is vacant, contains two MPCA monitoring wells and city and MPCA Stormwater infrastructure. <br />The site has a huge depression in the middle and is not buildable based on existing infrastructure and topography. <br />Based on these conditions the site has not been marketed and has no value in its current condition. Adjacent <br />property owners are the only ones that have the potential to utilize the parcel but it would come at a very large <br />cost. Staff has been in contact with both adjacent landowners (Ztech and WRC) and Z-tech is comfortable with <br />the development proposed by WRC.(See attached letter) A cost estimate to import and compact dirt, construct <br />retaining walls, demo and install storm water piping and to enlarge the regional storm totaling $640,130 to <br />prepare the site for development has been provided by RJ Ryan. The site is proposed to be sold for $1.00 based <br />on the existing conditions and the extraordinary cost required to accommodate the construction of both buildings. <br />Based on the existing condition of the site, selling it for the price of $1.00 does not constitute a business subsidy. <br />This has been supported by the information provided above and review by the City Bond attorney from TAFT Law. <br />MPCA and Stormwater Infrastructure <br />Staff began discussions on the viability of development of this site with the MPCA, WRC, RJ Ryan, City <br />Engineering Staff and the neighboring landowners. Initial feedback, and subsequent feedback from the MPCA <br />was supportive of the development of the site as long as the monitoring wells and MPCA infrastructure was not <br />negatively impacted. RJ Ryan worked with Hakanson Anderson and the City Engineer to evaluate the stormwater <br />infrastructure to identify what was needed to accommodate the future development and preserve functional city <br />stormwater solutions. RJ Ryan has found a stormwater solution that includes the installation and relocation of <br />existing stormwater pipes and the oversizing of an existing stormwater pond. LH Road, LLC will need to be <br />obtain formal approvals from the MPCA on the development plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.