Laserfiche WebLink
PRELIMINARY PROGRAM SUMMARY <br />The table below reflects the working program as of May 4, 2026. Square footages are preliminary planning estimates and <br />are subject to refinement through schematic design. <br />SPACE <br />APPROX. SF <br />NOTES <br />Coffee + Tea Bar / Back Bar <br />Back -of -House Operations <br />—700 <br />—300 <br />Flexible Gathering + Seating + Entry + Co-op —3050 <br />Community Rooms (x2) <br />Children's Room <br />Artisan Marketplace <br />Elevate Hope House Office <br />ADA Restrooms <br />Stair Cores (x2) + Circulation <br />Storage / Mechanical / Utilities <br />—400 <br />Espresso, drip, tea service, digital <br />menu boards <br />Triple sink, dishwasher, cold <br />storage, ice machine, dry storage <br />Daily cafe seating, large gather <br />table, adaptable layout for events <br />—12' x 16' each (-192 SF); <br />collapsible walls; seats 8 per room <br />—200 Visible, family -safe play area <br />Integrated <br />—200 <br />Built-in shelving along storefront <br />windows <br />Relocated to first floor; private <br />program administration <br />—150 Code -required, publicly accessible <br />—400 <br />—300 <br />Two means of egress required for <br />upstairs occupancy <br />Back -of -house support; final layout <br />TBD <br />FIRST FLOOR SUBTOTAL —5,700 SF <br />Apt.#1— 2BR <br />Apt. #2 — 2BR <br />Apt. #3 — 2BR <br />Shared Circulation + Stair Landings <br />Mechanical / Utilities <br />—850 Transitional housing unit <br />—850 Transitional housing unit <br />—850 Transitional housing unit <br />—350 <br />Two stair cores extending from first <br />floor; corridor access <br />Individual Units HVAC, water heater, panel area <br />SECOND FLOOR SUBTOTAL —3,000 SF <br />