My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Economic Development Authority - 06/11/2026
Ramsey
>
Public
>
Agendas
>
Economic Development Authority
>
2026
>
Agenda - Economic Development Authority - 06/11/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2026 1:30:16 PM
Creation date
6/4/2026 4:30:31 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Economic Development Authority
Document Title
06/11/2026
Document Date
06/04/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONCLUSION <br />The Elevate Hope House mixed -use development at Parcel #47C is a well -conceived, mission -driven project with a <br />program that is architecturally sound and appropriate for the site. The proposed use of a COR-1 corner parcel for <br />vertically -integrated community -serving commercial and residential development is not merely compatible with the city's <br />zoning intent, it is precisely what COR-1 was written to produce. <br />Resilience Architecture + Design is honored to be part of this team and is committed to delivering thoughtful, <br />code -compliant architectural services that serve both the operational needs of Gather and the housing mission of Elevate <br />Hope House. <br />Respectfully submitted, <br />Olivia Sprosty, AIA <br />Architect I Owner, Resilience Architecture PLLC <br />AIA Minnesota License #64414 <br />olivia@resilience-architecture.com I (608) 379-2108 <br />Date: 05/04/2026 <br />This letter is provided for proposal, planning, and fundraising purposes only and does not constitute a design contract, professional certification, or code <br />compliance determination. Final building code interpretations are subject to review by the Authority Having jurisdiction. Final construction pricing is <br />the responsibility of thegeneral contractor selected by the Owner. <br />
The URL can be used to link to this page
Your browser does not support the video tag.