Laserfiche WebLink
the CITY with a certified copy of the minutes of the governing board of each entity <br />which grants such authority. <br />d. Public Parkland. Park dedication will be satisfied with a combination of land and <br />cash contributions described further in this Agreement. <br />3. The Plans. The term "Plans" as used in this Agreement means the Final Plat Plans prepared <br />by Carlson Engineering, as revised dated April 10, 2026, as revised May 18, 2026. The <br />Plans remain subject to: (a) CITY Staff's review and approval of the Plans to, among other <br />things, confirm that the revisions requested in the CITY Staff s review letter have been <br />made; and (b) such further revisions as the PERMITTEE may propose and the CITY <br />approves. The Plans shall not be attached to this Agreement, but are in the CITY'S files. <br />4. Stage I Improvements. The public improvements the PERMITTEE will construct or <br />install are as follows: <br />a. Trunk and lateral sanitary sewer. <br />b. Trunk and lateral water main. <br />c. Storm drainage facilities (when specified). <br />d. Stormwater maintenance through 90 percent buildout. <br />e. Streets. <br />f. Concrete curb and gutter (urban). <br />g. Lot grading. <br />h. Trail development. <br />i. Sidewalks. <br />j. Electricity. <br />k. Cable with 911 capabilities. <br />1. Natural gas. <br />m. Boulevard sodding (final) or temporary boulevard seeding. <br />n. Water shut off boxes. <br />(the "Stage I Improvements"). <br />The PERMITTEE agrees to construct the Stage I Improvements according to the terms <br />and conditions of this Agreement and in accordance with the Plans and the City Code. Per <br />City Code Section 117-615, the PERMITTEE shall provide the CITY with a set of re- <br />producible as -built plans in PDF format within thirty (30) days after completion of the <br />Stage I Improvements and acceptance by the CITY. As as -built plans are a required Stage <br />I Improvement item per City Code Section 117-615, the CITY will not release in its <br />entirety the required Stage I Improvement Financial Guaranty noted in Section 12 below <br />until such as -built plans are received by the CITY. Additionally, the PERMITTEE agrees <br />to provide to the CITY the plans in CAD format prior to the commencement of <br />construction of the Stage I Improvements. <br />5. Installation of the Stage 1 Improvements. The PERMITTEE shall obtain all necessary <br />permits from all governmental agencies before commencing construction of the Stage 1 <br />Improvements. The PERMITTEE must provide the CITY with copies of all necessary <br />permits from other governmental agencies prior to or when the PERMITTEE or <br />PERMITTEE's builder applies for a building permit to construct improvements on a lot <br />within the Plat. <br />2 <br />