Laserfiche WebLink
(n) <br /> <br />Map <br /> <br />(a) <br /> <br />(b) <br /> <br />(d) <br /> <br />(e) <br /> <br />(g) <br /> <br />(h) <br /> <br />(i) <br /> <br />O) <br /> <br />(k) <br /> <br />(1) <br /> <br />(m) <br /> <br />Location of leachate collection <br />pretreatment systems. <br /> <br />treatment and <br /> <br />C - End Use Plan to include: <br /> <br />Final grade of proposed site showing elevations. <br /> <br />Location and species of vegetation to be replanted. <br /> <br />Location and nature of any structures to be erected in <br />relation to the end use plan. <br /> <br />Surface water _drainage, gas control structures, and <br />erosion and sediment control structures. <br /> <br />A soil erosion and sediment control plan. <br /> <br />A plan for dust and noise control. <br /> <br />A full and adequate description of all phases of the <br />proposed operation to include an estimate of duration of <br />the operation of each phase. <br /> <br />A plan for fire nuisance and vermin control. <br /> <br />Estimated daily and weekly volume of waste. <br /> <br />A deVelopment plan that shall show consideration of the <br />ultimate land use, for example, preplarmed building <br />islands, not to be used for a disposal area. <br /> <br />A plan or the submittal of assurances to the City from <br />private or public sources, satisfactorily addressing the <br />issue of long-term liability after landfill closure for the <br />monitoring and protection of environmental quality. <br /> <br />A plan or submittal of assurance to the City from private <br />or public sources satisfactorily addressing the issue of <br />long-term roadway maintenance during the operations <br />tenure on those routes providing primary landfill site <br />access. <br /> <br />A plan or submittal of assurances to the City from-private <br />or public sources satisfactorily addressing the issue of <br /> <br />9~118 117 <br /> <br /> <br />