Laserfiche WebLink
144 <br /> <br />Location and size of utility laterals and irridation taps. The <br />connection to the CiW municipal water system must be <br />. constructed of ductile iron pipina with a gate valve in the street <br />for operation. The size of in'i~ation meters is subject to -the <br />approval of the CiW Engineer. <br /> <br />All irri~ation systems must have an approved backflow device <br />installed in the in'igation enclosure, h'rie, ation enclosure location <br />and construction materials are subiect to the approval of the City <br />Engineer. Further. all new or updated systems must instal], a <br />Rain Sensor device to stop irrigation during rain events. <br /> <br />Location and material uses for all screening devices. <br /> <br /> Subd. 4. Amended Conditional Use Permits. An amended conditional use <br />permit may be applied for and administered in a manner similar to that required for a new <br />conditional use permit. Amended conditional use permits shall include~,. ....... ~m~-~,-,-~:~*:~"° ~,,e^' <br />perm"t:: that he. ye been denied, requests for substantial changes in conditions or expansions of <br />use, and as otherwise described in this Chapter. <br /> <br /> Subd. 5. Cancellation of Conditional Use Permits. Unless otherwise <br />specified by the Council at the time it is authorized, a conditional use permit, ' ......... ;** ..... *~.'~ <br /> <br />Zo~ng C'omm-Assion er Co"~ci!, shall become null and void one (1) year after the final action of <br />the Council if not initiated or utilized. The City shall noti~ the CUP holder of such a lapse of <br /> <br />~a ~;,m~ eack d ........... ~;*; .... .~.~,~ ,~.,~ .... ;+k; ...... r~ ...... ~m the '~'~ of ;*~ <br />a~ ........... ~ or if the use is discontinued fo~ a continuous ~elve (12) month period, unless a <br />petition for an extension of time in which to complete or utilize the use that has been ganted by <br />the Council. Such extension shall be requested in ~iting and filed with the City at least thi~y <br />(30) days before the expkation of the original conditional use pe~it. The request for extension <br />shall state hcts showing a good hith attempt to complete or utilize the use pe~i~ed in the <br />conditional use pe~it. Such petition shall be presented to the~m~--:.~,,~,o .... ~ Zoning <br />CcmmissicnPl~nin~ Commission for a recommendation to the Council ~d acted upon by the <br />Council. <br /> <br /> Subd. '6. Duration of Conditional Use Permits. A conditional use permit <br />shall remain in effect as long as the conditions agreed upon are observed and the permit holder is <br />in compliance with all other regulations or standards of this Chapter. <br /> <br />Subd. 7. Performance Security <br /> <br />Upon approval of a conditional use permit and when deemed necessary, the' <br />Permittee shall provide the City with a financial surety, in an amount and <br />form determined to be acceptable to the City. Said surety shall guarantee <br />compliance with any required improvements or development associated <br /> <br />9-30 Mex-ch ;02 Draft <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />