My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 05/01/2003
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2003
>
Agenda - Planning Commission - 05/01/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:30:47 AM
Creation date
6/4/2003 10:28:49 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
05/01/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
395
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />dirt berm not less than thirty (30) inches in height and six (6) feet in <br />width at the basel <br /> <br />All reasonable means shall be employed by applicant to reduce dUst, <br />noise and nuisances. <br /> <br />Noise - the maximum noise level at the perimeter of the work site <br />shall be within the limits set by the Minnesota Pollution Control <br />Agency and the Environmental Protection Agency of the United <br />States. <br /> <br />f. <br /> <br /> :.: ,,7:00 <br />Hours - all mining operations shall be conducted between ¢ ~n <br />a.m. and 8:00 p.m. on weekdays only unless otherwise specifically <br />approved by the City Engineer or their agent. <br /> <br />Explosives - the use and handling, of explOsives shall be coordinated <br />with the City Police Department. Blasting shall occur only at hours <br />specified by the police department and at no other time. <br /> <br />ho <br /> <br />Dust - operators shall utilize all practical means to reduce the amount <br />of dust caused by the operation. In no case shall the amount of dust <br />or other particulate matter exceed the standards established by the <br />MPCA. No operations shall be allowed when wind gusts exceed 30 <br />MPH. <br /> <br />Water pollution - operators' shall comply with all applicable <br />Minnesota Pollution Control Agency regulations and Federal and <br />Environmental Protection Agency regulations for the protection of <br />water quality. No waste products or process residue, including <br />untreated wash water, shall be deposited in any lake, or natural <br />drainage system, except that lakes or ponds wholly contained within <br />the extraction site may be so utilized. <br /> <br />Top soil preservation - all top s0il shall be retained at the work site <br />until complete rehabilitation of the work site. has taken place <br />according to the rehabilitation plan. <br /> <br />ko <br /> <br />Designated haul routes shall be maintained by the operator in <br />accordance with Minnesota Department of Transportation's <br />Specification 2051.4 as found in the Minnesota Department of <br />Transportation Standard Specifications for Construction 1983 <br />Edition. <br /> <br /> Sobd. 9. Dangerous Operations. The operators shall change, alter or <br />modify immediately any excavation or operation therein deemed by the Council to be unsanitary <br />or dangerous or polluted or contrary to the general health and welfare of the community. <br /> <br />251 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.