Laserfiche WebLink
I <br /> I <br /> I <br /> I <br /> I <br />'1 <br /> <br />Item 14 Mitigation Element. The Ramsey 2001 Comprehensive Plan was amended in <br />2002 and contains the measures needed to effectively implement resource protection for <br />all of the resource protection zones adjacent to the RTC site. <br /> <br />The City's compliance with each of the applicable Executive Order 79-19 Standards and <br />Guidelines that must be followed is assured through implementation of the Plan. Since <br />the regulated area is not on the project site, but could be affected by it, the City will <br />evaluate all phases of construction for impact on the regulated area. <br /> <br />DNR has ascertained that, based on the information provided to them, the applicable <br />Executive Order 79-19 Standards and Guidelines for which compliance is needed appear <br />to include the following items. TheExecutive Order citation is followed by the section in <br />the Ramsey 2001 Comprehensive Plan (CP) in which the DNR reference is addressed: <br /> <br />· The lands and waters within the Rural Open Space District shall be used and <br /> developed to preserve their open, scenic and natural characteristics and ecological and <br /> economic functions. [E.O. 79-19 -A. CPXI..C.I.a] <br />· Protect bluffs greater than 18% and provide conditions for the development of bluffs <br /> between 12% and 18% slopes.[ E.O. 79-19 - C.l.a.(4) CPXJ. C. 2. c] <br />· Minimize runoff[E.O. 79-19- C.l.a.(5) CPXLC. 2. a] <br />· Improve the quality of runoff. [E.O. 79-19 - C.l.a.(5) CPX~.C. 2. a] <br />· Minimize site alteration. [E.O. 79-19- C.l.a.(6) CPXI. CI.c] <br />· Erosion control. [E.O. 79-19 - C.l.a.(6) CPXI. C. 2. a] <br />, Management of vegetation cutting. [E.O. 79-19 - C.l.a.(7) CPXI..C. 2. a] <br />· *Control of noise in open space and recreational areas. [E.O. 79-19 - C.I.a.(8)] <br />· Site plans required for all development for which a permit is required, except single- <br /> family residential structures. [E.O. 79-19 -C.2.a. CP XI.C. 2. c] <br /> · New development and expansion permitted only after the approval of site plans <br /> which adequately assess and minimize adverse effects and maximize beneficial <br /> effects. <br /> · Site plans shall include activities undertaken to ensure consistency with the <br /> objectives of the Designation Order and shall include measures which address <br /> adverse environmental effects. <br /> · Site plans shall include standards to ensure that structures, roads, screening, <br /> landscaping, construction placement, maintenance, and storm water runoff are <br /> compatible with characteristics and use of corridor in that district. <br /> · Site plans shall contain specific conditions with regard to buffering, landscaping, <br /> and revegetation. <br />· Standards for structure site and location to ensure riverbanks, bluffs, and scenic <br /> overlooks remain in their natural state. [E.O. 79-19 - C.2.b. CP XI. C. 2. c] <br />· Retention of existing vegetation and landscaping [E.O. 79-19 - C.2.e.(1) CP <br /> XZ CZa] <br />· Maximization of the creation and maintenance of open space and recreational <br /> potential of the Corridor in accordance with the standards. [E.O. 79-19 - C.6 CP <br /> XI.C. 2. c] <br /> <br />D-9~ <br /> <br />41 <br /> <br /> <br />