My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 05/01/2003
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2003
>
Agenda - Planning Commission - 05/01/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:30:47 AM
Creation date
6/4/2003 10:28:49 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
05/01/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
395
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
82 <br /> <br />6. Finish floor elevations of all buildings; <br /> <br />Identify soils by type and location, including <br />identification of the water table, and suitability of <br />soil for the proposed development; and <br /> <br />Identify any areas located in a flood hazard zone as <br />identified by the Department of Natural Resources. <br /> <br />iV. <br /> <br />Floor Plans and Elevations. All floor plans and <br />elevations shall be drawn to a legible scale and shall <br />include the following i,nformation: <br /> <br />Floor plans indicating square footage and <br />dimensions of all proposed rooms; and <br /> <br />Elevations of the proposed building(s), identifying <br />exterior treatment, material(s), and paint color. <br /> <br />Vo <br /> <br />Final Plat. If a Subdivision is required, the final plat shall <br />be prepared in accordance with the Ramsey City Code. <br />With the final plans, the developer shall submit, for <br />approval by the City, a development schedule for <br />construction of all structures, open space, and recreational <br />facilities. <br /> <br />Final Plat and Site Plan Review Process <br /> <br />Upon approval of the Preliminary Plat and Site Plan, a <br />Final Plat and Site Plan shall be prepared in accordance <br />with the regulations of this Chapter and submit it to the <br />Zoning Administrator 30 days prior to the public hearing. <br /> <br />ii. <br /> <br />The Final Plat and Site Plan shall be submitted to the City <br />staff for review and comment,-, to insure compliance with <br />the Preliminary Plan, Site Plan and other City codes and <br />regulations. <br /> <br />iii. <br /> <br />The Final Plat and Site Plan shall be submitted to the Town <br />Center Review Board for its review and comment. The <br />Town Center Review Board shall review the proposed <br />project for its compatibility with the Preliminary Plat, Site <br />Plan, Town Center Master Plan and Design Standards and <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />! <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.