My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 03/06/2003
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2003
>
Agenda - Planning Commission - 03/06/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:30:21 AM
Creation date
6/4/2003 10:56:32 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
03/06/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. <br /> <br />I3. <br /> <br />14. <br /> <br />sidewalk construction shall be borne by the developer and not eligible <br />for credit against park and trail dedication fees. The design must meet <br />current standards of the Cityl comPlY with the Americans for <br />Disabilities ACT (ADA); and be shown on the preliminary plat for <br />approval. All sideWalks required by the City. shall be constructed of a <br />four-inch concrete placed on. a four inch (4") gn'avel base. <br /> <br />(a) Maintenance The City CoUnCil annuallY Shall determine the <br /> level of snow removal-required of adjacent homeowners and 'to. <br /> Provide for the establishment of a fund to allow for repair or <br /> replacement of damaged Sidewalks in the future. <br /> <br />:Boulevard Sodding. Th_is item shall be' completed jus~ <br />occupancy of' the bui-ldinm This item may be completed sooner <br />provided the developer or subdivider maintain the sod until the <br />dwelling or structure is occupied. The water Shut-off boxes shall be <br />adiusted at the time the final boulevard g-rude is established. The water <br />shut-off boxes shall remain visible after the boulevard sod is installed. <br /> <br />As-built Plans. Upon completion of installation of all 'required <br />improvements, the subdivider shall file with the City_ copies of plans <br />and specifications showing ail improVements as finally constructed <br />and installed in both digital and paper fmTn as required by the City <br />Enaineer. Such as-built drawinas shall be certified to be. true and <br />accurate by the re~stered engineer responsible tbr the installation of <br />the improvements. <br /> <br />Escrow of ReqUired Deposits. Ail sums deposited with the City in <br />accordance with this Section shall be kept in separate funds which <br />funds shall be encumbered and earmarked for the later construction of <br />t. he particular improvements within the particular Subdivision.. These <br />funds are deposited into a non-interest barring fund. <br /> <br /> ¢. Subd. 4. Stage II Improvements. The following items shall be <br />installed by the CiTM or, Subcontractors, at the expense of the Developer. <br /> <br /> a. 1. Street Striping And Signing, Street signage shall include Street <br /> name. traffic control, and advisory, s n . ~:v ........ t- ................... , <br /> <br /> ~,~,~ ...... j ....... / ~._~ ....... Street striping shall be completed on all <br /> major thoroughfares,, commercial and industrial 'streets as required by the <br /> City Engineer. Striping shall be completed after sealcoating is done. <br /> <br />9-54 <br /> <br /> I <br /> I <br />i <br />I <br />! <br />I <br />I <br />I <br />'1 <br /> <br /> December 2002 Draft <br />100 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.