Laserfiche WebLink
I <br /> I <br /> I <br /> I <br /> <br /> I <br /> I <br /> I <br />I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> <br /> Subd. H:O. Construction by City. The City shall have the fight' toinstall g;.'.ch 1 <br />any or all' of the required improvements.as it may elect and upon such terms and conditions asit <br />may deem appropriate under the circumstances. <br /> <br /> Subd. 15!. Warranty. The City shall, where 'appropriate, require a subdivider <br />submission of a warranty/maintenance bond-in the amount equal to. that established by. the <br /> , ...... 6 ................. ,v .... m ..... which shall be in' force for one <br />year following the final acceptance of any required improvements, and shall guarantee <br />satisfactory performance of said improvements. - ' . <br /> <br />9.50.51 Monuments <br /> <br /> Subdivision 1. Official monuments as designated and. adopted by the Anoka <br />County Surveyor's Office and approved by the Anoka County District Court for use as judicial <br />monuments shall be set at each comer or angle on the outside boundary of the final plat or in- <br />accordance with a plan as approved by. the City Engineer. The boundary line of.the-property to <br />be included with the plat shall be fully dimensionedi all angles of the boundary excepting the <br />closing angle shall be indicated,, all monuments and surveyor's irons shall be indicated and each <br />angle point of the boundary per/meter shall be so monumented. ' <br /> <br /> Subd. 2. Pipes or steel rods shall be placed at each lot Comer.and at cach <br />m .............~,,,.,~, ,~,,,,,~, ,,,,,~o. All Unite States, tare, County or other official bench marks <br />monuments or triangular stations in or adjacent to the property shall be preserved' in precise <br />position and shall be recorded on the plat.. Ail lot and block dimensions' shall be on the plat and <br />all necessary angles pertaining to the lots and blocks 'as an aid to future surveys shall .be shown <br />on the plat. No ditto marks will' be permitted in indicating dimensions. . ' <br /> <br /> Subd. 3. To insure that all irons and monuments are correctly in place following <br />the final grading of a plat, a second monumentation shall be required. Proof of the second <br />monumentation shall be in the form of a surveyor's certificate and this requirement shall <br />additionally be a condition of certificate, of occupancy as provided for in .the .City Zoning <br />Chapter, as may be amended.· . . ' ': .. <br /> <br /> ~ ......... p ................... Vehxcle Access into Construction 'sites. <br /> <br /> There will not be any building constructiOn allowed, until a Class 5 driving <br />surface is installed to within at least 300 feet of any building. Additionally, there will not be' <br />any certificate of occupancy allowed nnitil the parking or-driving surface is paved with at <br />least one layer of bituminous surfacing. · <br /> <br />December 2002 Draft <br /> <br />9-61 <br /> <br />107" <br /> <br /> <br />