Laserfiche WebLink
CC Regular Session <br />Meeting Date: <br />Primary Strategic Plan Initiative: <br />5. 8. <br />06/23/2026 <br />Address infrastructure needs. <br />Title: <br />Adopt Resolution #26-146 Accepting Sewer Cleaning and Televising Proposals for 2027 Pavement Management <br />Program Projects <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #26-146 accepting proposals and awarding contracts for sewer <br />cleaning and televising for 2027 Pavement Management Program projects. <br />Background: <br />Testing of existing utilities, which includes sanitary sewer, storm sewer, and watermain is standard practice when <br />designing street reconstruction projects. Newly paved streets in Ramsey are anticipated to have a 60-year life <br />span, assuming proactive maintenance. Identifying damaged or failing municipal utilities under streets before <br />they are reconstructed allows the required repair or replacement work to be completed as part of the street <br />reconstruction project before the new pavement is placed, preventing costly pavement repairs after the fact. <br />Sewer testing consists of first cleaning the pipe with a water jetter, then using a camera to televise the inside of the <br />sewer pipes (sanitary and storm). Staff does not have the equipment needed to complete the televising work <br />in-house, and staff generally does not have sufficient time to clean the sewer pipes in advance of being televised. <br />Televising sewer pipes informs staff of the condition of the pipes, and locates existing damage, if present. This <br />allows staff to include the required repair or replacement work for any damaged pipes into the street <br />reconstruction plans, which is typically more cost-effective than doing repairs as standalone projects, or as <br />change orders during the reconstruction project. <br />Staff requested proposals for each reconstruction project from five (5) contractors known to perform this work. <br />Proposals for each project were received from ()of the contractors, which are tabulated below. <br />Contractor IP 25-08 IP 27-01 IP 27-06 <br />American Environmental LLC $31,165.76 $12,725.00 $29,270.50 <br />Hydro-Klean, LLC $44,573.29 $24,322.03 $68,039.90 <br />Nelson Sanitation & Rental Inc. $34,406.10 $11,590.10 $23,148.70 <br />American Environmental LLC submitted the lowest responsible proposal for IP 25-08. Nelson Sanitation & <br />Rental, Inc. submitted the lowest responsible proposals for IP 27-01 and IP 27-06. Per the RFP, staff recommends <br />awarding the contracts to the lowest responsible bidder for each subsequent project, rather than the lowest <br />combined for all three projects. <br />The Contractors are required to complete their work within 30 working days of the notice to proceed issued by the <br />city. <br />Notification: <br />