My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/23/2026
Ramsey
>
Public
>
Agendas
>
Council
>
2026
>
Agenda - Council - 06/23/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2026 1:35:52 PM
Creation date
6/18/2026 3:00:58 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/23/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOLTON <br />& MENK <br />Real People. Real Solutions. <br />June 2, 2026 <br />Joe Feriancek, P.E. <br />Assistant City Engineer <br />7550 Sunwood Drive NW <br />Ramsey, MN 55303 <br />7533 Sunwood Drive NW <br />Suite 206 <br />Ramsey, MN 55303-5119 <br />Ph: (763) 433-2851 <br />Fax: (763) 427-0833 <br />Bolton-Menk.com <br />RE: Proposal for Construction Staking Services, City of Ramsey — Carol -Rose Acres & Sports Haven <br />Street Reconstruction Projects (City Project No. 26-03) <br />Dear Mr. Feriancek: <br />We appreciate the opportunity to assist the City of Ramsey with construction staking for the above - <br />referenced projects. <br />SCOPE OF WORK <br />Bolton & Menk will complete the construction staking and as -built survey for this project, which <br />generally includes: <br />• 1.2 miles of rural section street reconstructions, <br />• 64 RDST of Subgrade Bluetops, <br />• 64 RDST of Base Course Blue Tops, <br />• Removal limits, <br />• 10 Flared End Sections, <br />• 47 Driveway Tie-ins, <br />• 2,160 LF of Sediment Control Logs, <br />• 2,415 LF of Silt Fence, <br />• Salvaging 38 Mail Box Supports, and <br />• Miscellaneous other items. <br />We will also complete the As -Built Survey for Record Drawing creation. <br />ASSUMPTIONS <br />We have made the following assumptions in preparing this proposal: <br />• No allowance is included for staking of right-of-way. <br />• Replacing damaged or removed stakes is not included in our base fee. <br />• No additional fees for stakes, mileage, equipment, etc. will be invoiced to the City, but are <br />included in our hourly rates. <br />• Additional services, if required, will be performed at the rates presented in the Proposed Fees <br />section of this proposal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.