Laserfiche WebLink
Front + Side Patios <br />110 1,IIIII' IIi;,; Illblk, IIII "IIIIIIIIIll h Uw1,➢1161III hIIII 1,1 <br />U�UU IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII <br />II IIIIII'11` IIIII�11IIIIIIIIIIII! ma"��11ii�� I�II1IIIIIIIII Illllm III" �t'9"i ;;;;11�1u� w !ti IIIII Illlllllii Illlli � lllli"�iilluiAn' <br />IIII IIII III III IIIIIIIIIIIIIIIIIIIIIIIIIIIIII I IIIII IIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIII I I IIIIII I I II IIII III I I I I I I I I I IIIII I I I IIII I I II 01IIIIIIIIIIIIIIIIIIII I I I I I I III I I I I I I I I I II�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIIIIIIIII <br />11111111'.n IIII "!16I °IIII Il: III: f r11,1 <br />00iv. 00 00 10 „If0,„‘ 1 07m <br />IIII 000 0ll lllllllllllllllllnlllllllllllllllllll)Illllllllltl lll0000000000 <br />-1,300 <br />100 <br />m(114111 "'IIII' <br />1111 <br />000000 <br />llllllll l llllllliil�llllllllllll 1111,11 l lllllllllllllllllllllllllllll <br />IIIIIIIIIIIIIII IIIII1IIIIIII1111111111111111111111111111111111111111 <br />Outdoor gathering; pergola at NE <br />corner with privacy wall and <br />string -light run <br />110 <br />000000000001III <br />IIII IIIIII <br />0000il000001000li00000000000010l liiiilliiilliiiil o <br />The lot width is approximately 84 feet, with an estimated lot depth of approximately 275 feet based on the stated <br />0.53-acre lot area. These figures yield a site area of approximately 23,090 SF. <br />Based on these dimensions and the -5,700 SF first -floor target, the anticipated first -floor building footprint is: <br />- Building width: 50-60 feet, after final COR-1 setbacks and build -to line are confirmed <br />- Building depth: 100-125 feet, to achieve approximately 5,700 SF at the working width <br />Per the civil engineer (Matt Davich, EGR&UD), there are no significant setback or onsite parking requirements for this <br />lot, and stormwater is handled offsite through a regional pond. Final setback and build -to line requirements will be <br />confirmed against the COR Design Framework now in hand, in coordination with the City of Ramsey Planning <br />Division. <br />1, l l:],00 l Ta l l 1"" I. IIIC i" 1 µ Ulf IIII II�.�� Ilu1 l l� <br />New mixed -use construction in the Minneapolis -Saint Paul metro currently ranges from approximately $200 to $325 per <br />square foot for hard construction costs alone. At -8,700 SF, that range yields an unassisted hard -cost band of <br />approximately $1,740,000 to $2,827,500. <br />Hard construction costs do not include: <br />Architectural, engineering, and consulting fees (typically 8 to 12% of construction cost) <br />Site preparation, utility connections, and civil work <br />Furniture, fixtures, and equipment (FF&E) <br />Permitting and city fees <br />Owner contingency (recommended at 10 to 15% at this stage of design) <br />Sprinkler system, estimated at $4 to $7 per SF (-$35,000 to $61,000 at this building size) <br />