My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 07/14/2026
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2026
>
Agenda - Council Work Session - 07/14/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2026 3:07:15 PM
Creation date
7/13/2026 2:11:25 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
07/14/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AMENDED <br />J5 performance record and a satisfactory record of law compliance, integrity and business <br />96 ethics. <br />97 <br />98 (c) The firm will pay all craft employees on the project, at a minimum, the applicable wage and <br />99 fringe benefit rates, as established for the classification in which the worker is employed, in <br />100 accordance with the Pennsylvania Prevailing Wage Act. 43 PA. CONS. STAT. y 165-1 et seq <br />101 as amended or rec.odified. These wages shall also be paid to employees performing any <br />102 custom fabrication work for the project. For purposes of this subsection., custom fabrication <br />103 shall mean the fabrication. assembly modification or other production of non-standard <br />104 goods, or materials. including components, fixtures, or parts thereof, that are fabricated <br />105 assembled or modified offsite, but produced specifically for a project covered by this <br />106 ordinance. This requirement shall include, but not be limited to custom fabrication for <br />107 electrical, plumbing, mechanical, refrigeration, heating, cooling, ventilation, sheet metal or <br />108 other duct systems, mechanical insulation, ornamental iron work or boiler systems. <br />109 Fabrication shall also include the fabrication, assembly or other production of components <br />110 or structures prefabricated to specifications for a particular project covered by this <br />111 ordinance, <br />112 <br />113 § 2-1101.3. Contractor Responsibility Certifications <br />114 (a) As a condition of performing work on a public works contract subject to this ordinance, a <br />115 general contractor, construction manager or other lead or prime contractor seeking award of <br />116 a contract shall submit a Contractor Responsibility Certification as specified herein. <br />117 <br />118 (b) The Contractor Responsibility Certification shall be completed on a form provided by the <br />119 City and reference the project for which a bid is being submitted by name and contract or <br />120 project number. <br />121 <br />122 (c) In the Contractor Responsibility Certification, the construction manager, general contractor <br />123 or other lead or prime contractor shall confirm the following facts regarding its past <br />124 performance and work history and its current qualifications and performance capabilities: <br />
The URL can be used to link to this page
Your browser does not support the video tag.