My WebLink
|
Help
|
About
|
Sign Out
Home
03/17/98
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Architectural Review Board
>
Agendas
>
1998
>
03/17/98
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2025 3:02:40 PM
Creation date
6/4/2003 3:50:44 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Business Park 95 Architectural Review Board
Document Date
03/17/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASE <br /> REQUEST FOR REVISED SITE PLAN APPROVAL OF AMCON WEST; <br /> CASE OF AMCON CORPORATION <br /> By: Sylvia Frolik, Zoning Administrator <br />Background: <br /> <br />The City of Ramsey has received a revised site plan for approval from Amcon Corporation. The <br />plan approved in 1997 was for a 49,390 square foot office, manufacturing and warehouse facility <br />on Lot 1, Block 2, Business Park 95 4th Addition. The approved plan included a future <br />expansion of approximately 20,000 square feet. The developer has made a decision to construct <br />the entire structure in one phase and thus the site plan approval needs to be amended for a 69,440 <br />square foot facility. Chem-Graphics will be the anchor tenant in this multi-tenant facility. The <br />following items are enclosed for your information: <br /> <br />a) <br />b) <br />c) <br />d) <br />e) <br /> <br />Site location map <br />1997 Site plan <br />Revised Site Plan and memo from Amcon dated February 26, 1998 <br />Staff review letter dated Feb..ruary 27, 1998 <br />Memo from Parks Supervisor dated March 11, 1998 <br /> <br />Observations: <br /> <br />The site is proposed to have three accesses onto McKinley Street; the easterly one for truck <br />traffic and the other two for customers/employees. The site is approximately 5.3 acres in size <br />and the proposed structure does not exceed the 35% building coverage restriction. The building <br />is also in conformance with height and setback restrictions and will consist of pre-cast concrete <br />panels. In accordance with City Code, there will be a 20-foot wide landscaped area along <br />McKinley Street. The current plan and future build out plan is in compliance with the 10% green <br />space and 85% impervious surface restrictions in the Business Park 95 Covenants. <br /> <br />The memo from Amcon estimates that a minimum of 98 parking spaces will be required at the <br />site ultimately. The site plan shows 83 being provided initially and the potential for 99 more, for <br />a grand total of 182. The driveways, loading areas and off-street parking areas are proposed to <br />be surfaced with bituminous and finished with B612 concrete curbing. <br /> <br />A revised Grading Plan dated February 17, 1998 has also been received and determined <br />acceptable by the City Engineer. <br /> <br />The Lighting Plan is acceptable. A Landscape Plan has been received and the developer is <br />commended for selecting plant species that have a proven survivability in Ramsey soils. The <br />proposed prairie seeding on the south side of the site is prudent and it is suggested that black <br />eyed susans be added to the seed mixture. The Planning Commission has recommended that the <br />tree screening on the southwest comer of the site be intensified to screen dock activity from <br />Sunfish Lake Blvd. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.