My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/27/2007
Ramsey
>
Public
>
Agendas
>
Council
>
2007
>
Agenda - Council - 02/27/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 10:00:34 AM
Creation date
2/23/2007 1:45:38 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/27/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• iv. Floor Plans and Elevations. All floor plans and <br />elevations shall be drawn to a legible scale and shall <br />include the following information: <br />aa. Floor plans indicating square footage and <br />dimensions of all proposed rooms; and <br />bb. Elevations of 'the proposed building(s), <br />identifying exterior treatment, material(s), <br />and paint color. <br />V. Final Plat. If a Subdivision is required, the final <br />plat shall be prepared in accordance with the <br />Ramsey City Code. With the final plans, the <br />developer shall submit, for approval by the City, a <br />development schedule for construction of all <br />structures, open space, and recreational facilities. <br />2. Final Plat and Site Plan Review Process <br />i. Upon approval of the Preliminary. Plat and Site <br />Plan, a Final Plat and Site Plan shall be prepared in <br />• accordance with the regulations of this Chapter and <br />submit it to the Zoning Administrator 30 days prior <br />to the public hearing. <br />ii. The Final Plat and Site Plan shall be submitted to <br />the City staff for review and comment, to insure <br />compliance with the Preliminary Plan, Site Plan and <br />other City codes and regulations. <br />iii. The Final Plat and Site Plan shall be submitted to <br />the Town Center Review Board for its review and <br />comment. The Town Center Review Board shall <br />review the proposed project for its compatibility <br />with the Preliminary Plat, Site Plan, Town Center <br />Master Plan and Development Guidelines and make <br />a recommendation to the City Council regarding the <br />proposed Final Plat and Final Site Plan. <br />The City Council shall approve, postpone, or <br />disapprove the Final Plat and Site Plan based on its <br />appropriateness and conformance with the <br />Preliminary Plat and Site Plan and the Town Center <br />• Master Plan and Development Guidelines. <br />—151— <br />
The URL can be used to link to this page
Your browser does not support the video tag.