My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 07.21.2026
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2026
>
Agenda - Public Works Committee - 07.21.2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2026 2:19:45 PM
Creation date
7/16/2026 1:14:09 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Title
07.21.2026
Document Date
07/16/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
#26-01 MSA Bunker Lake Boulevard Reconstruction <br />• Construction substantially complete and open to traffic <br />• Final completion Spring 2027 <br />#26-02 2026 MSA Pavement Overlay Improvements <br />• Plans submitted to State Aid for review and approval <br />• 2026 construction proposed <br />#26-03 Carol -Rose Acres & Sports Haven Street Reconstructions <br />• Under construction <br />• Substantial completion proposed by August 28th <br />• Final completion Spring 2027 <br />#26-04 Countryside Estates & Wildwood Acres Street Reconstructions <br />• Construction substantially complete <br />• Final completion Spring 2027 <br />#26-05 Flintwood Hills 2nd & 3rd Street Reconstructions <br />• Construction substantially complete <br />• Final completion Spring 2027 <br />#26-06 Riverside West Street Reconstructions <br />• Contract awarded to North Valley July 14th <br />• Substantial completion proposed by October 2nd <br />• Final completion Spring 2027 <br />#26-07 Section 01 Unplatted (S. CR 27) Street Reconstructions <br />• Substantial completion proposed by August 28th <br />• Final completion Spring 2027 <br />#26-08 2026 Neighborhood Pavement Overlay Improvements <br />• Area 1 — milled and paved <br />• Area 2 — curb complete, paving soon <br />• Area 3 — removals in progress <br />• Final completion Spring 2027 <br />#26-09 2026 Crack Seal Improvements <br />• Prepared plans and specifications in-house <br />• Scheduling preconstruction meeting with MP Asphalt Maintenance <br />#26-10 2026 Pavement Rejuvenation Improvements <br />• Construction complete <br />#26-11 2026 Pavement Marking Improvements <br />• Under construction <br />• Adding crosswalk striping and driveway arrow for splashpad <br />#26-53 2026 Pavement Skim Patching Contracted Services <br />• Under construction <br />• Substantial completion proposed by July 31st <br />#25-08 Sunwood Drive Crosswalk Repairs <br />• Preparing plans and specifications in-house <br />• 2027 construction proposed <br />#25-12 COR Street Lighting Improvements <br />• Street lights proposed along Ramsey Parkway and all intersections <br />• Connexus Energy prepared final plans and required agreements <br />• Underground work will he completed in 2026 but some/all poles and light fixtures may not be installed <br />