Laserfiche WebLink
o Extend pedestrian trail south of US 10/169 from 500-feet East of Adams Street to Edison Street <br />o Construct pedestrian crossover/refuge in median of US 10/169 at Jarvis Street <br />o Remove, repair and replace drainage culverts <br />o Construct, repair and replace misc. guardrail/end treatments <br />• 2027 construction proposed <br />• 95-percent plans complete <br />• No public open houses scheduled yet for Elk River or Ramsey <br />Studies & Items of Interest <br />Wetland 114P Outlet Control Structure <br />• Staff continue to monitor water levels. No updates at this time. <br />Commercial/Industrial/Residential Developments <br />• Staff can respond to questions as needed. <br />Miscellaneous Staff Updates <br />• Utilities Supervisor John Nelson will present updates on the redundancy/safety features built into the new <br />Water Treatment Plant to ensure treated water will remain safe to drink at all times, and will discuss when <br />the water tower at Dysprosium Street and Nowthen Boulevard is proposed to be painted as requested during <br />the February 17th PWC meeting. See separate case. <br />PWC Future Tonics Calendar Discussion Items <br />See calendar in following case. <br />Time Frame/Observations/Alternatives: <br />Staff estimates up to 15 minutes will be needed for updates and discussion. <br />Recommendation: <br />Staff can offer recommendations on specific items upon request. <br />Outcome/Action: <br />No formal action required. For Committee review and discussion purposes only. <br />No filets) attached. <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Brian Hagen Marsha Weidner 07/16/2026 01:00 PM <br />Fonn Started By: Bruce Westby Started On: 07/16/2026 09:32 AM <br />Final Approval Date: 07/16/2026 <br />