My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 07/28/2026
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2026
>
Agenda - Council Work Session - 07/28/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2026 3:15:11 PM
Creation date
7/28/2026 9:26:38 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
07/28/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BUDGET HIGHLIGHTS <br />• Staff time redistributed between streets, traffic engr, snow plowing & <br />utilities. <br />Increase Cracksealing/Rejuvenation/Pothole Patching - $50,000 (From <br />$650,000 to $700,000) (6488) <br />Replace 2004 Snogo Blower (#647) with Laue D40 Series Snow Blower - <br />$235,000 (net of $15,000 trade in) (6540) <br />Replace 2015 Kubota Tractor (#686) with Kubota M6-111 Tractor - <br />$112,000 (net of $20,000 trade in)(6540) <br />Replace 2016 Ford One -Ton with Dump & Plow (#692) with Ford Crew <br />Cab F550 with Dump & Plow Kubota Tractor with Kubota M6-111 <br />Tractor - $99,000 (net of $15,000 resale)(6550) <br />Replace 2007 Sterling Tandem (#662) with 2027 Western Star Tandem <br />Dump Plow Truck with Plow Equipment - $380,000. (6540) <br />GOALS OF CURRENT YEAR BUDGET: <br />• Maintain and improve city's rating of 7.0 average of road condition <br />• Increase use of contracted services on pothole repair (velocity patching) <br />• Increase prevenative maintenace to prolong the life of our public streets <br />• Maintain our city vehicles and equipment to the highest level possible <br />Performance Measurements: <br />Crack filling (miles) <br />Asphalt patching (tons) <br />2022 Actual <br />10.37 <br />380 <br />2023 Actual <br />18.36 <br />385 <br />2024 Actual <br />13.32 <br />390 <br />2025 Actual <br />19.16 <br />380 <br />2026 Projected <br />14.19 <br />370 <br />2027 Projected <br />17 <br />365 <br />-44- <br />
The URL can be used to link to this page
Your browser does not support the video tag.