My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Public Works Committee - 08/21/2001
Ramsey
>
Public
>
Minutes
>
Public Works Committee
>
2001
>
Minutes - Public Works Committee - 08/21/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 9:35:14 AM
Creation date
6/6/2003 11:25:06 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Public Works Committee
Document Date
08/21/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Drive (149'1' Avenue) requesting that the road screening wall be extended north of Sunwood <br />Drive to become continuous with the wall in the Willow Ridge subdivision to the north. The <br />screening wall was not installed in this location because there was no change in the grade of the <br />highway, unlike the section to the south of Sunwood Drive. The cost of the screening wall in <br />areas where there was a significant grade change was funded 80 percent with federal grant money <br />as an eligible portion of the highway project. Staff was directed to inquire whether 80 percent <br />funding might be available on this portion of the project. He presented the Committee with the <br />letter from MnDOT dated August 3, 2001 declining the request. The alternative of extending <br />this screening wall would be financially prohibitive at a cost of over $300,000. This cost could <br />double if residents on the west side of T.H. #47 also requested a like screening wall. There <br />would also be some technical problems associated with placing a screening wall through the <br />requested area. These problems would be associated with the falling grade from the roadway and <br />drainage flowing from the roadway into the wall. The petitioners did correctly point out that <br />approximately half of the pre-existing trees, mostly eastern red cedar, were removed as a <br />consequence of the project. Eight trees have been replanted in this area. Staff recommended that <br />additional trees be planted in this area to enhance the screening for the affected residences. <br /> <br />Carol Nielsen, 14950 Argon Street, Ramsey, noted that there are only four pine trees and two <br />deciduous trees buffering their homes from T.H. #47. She stated that she would agree that the <br />sound wall would probably not be beneficial in their area, but that does not alleviate the concerns <br />she has with the homes being located so close to the road. Her neighbor had a tire hit the back of <br />his house recently. When T.H. #47 was improved several large trees were removed and only six <br />were replanted, which are much smaller than what previously existed. <br /> <br />Shamila Sorenson, 5260 149th Lane, Ramsey, stated that part of her property extends to T.H. #47 <br />and she is very concerned with the close proximity of the roads to the houses and the increase in <br />noise since the large trees were removed. She expressed concern over the safety of people using <br />the bike path in that area. With the trees that use to be in the area she was unable to see T.H. #47 <br />and know that is all she sees. <br /> <br />Councilmember Hendriksen inquired as to what size trees could be planted in that area and what <br />would the cost be. <br /> <br />City Engineer Olson stated that staff did research that information and found that it would be <br />possible to place six-inch trees up to ten feet tall. The cost to relocate a tree that the City already <br />has would be approximately $200. If trees had to be located and transplanted the cost would be <br />$500 to $800 per tree. Mr. Olson noted that one difficulty with spruce trees is that the closer they <br />get to the road they take a hit from the road spray in the winter so the further away from the road <br />the better. He explained that one of the property owners recently had their property surveyed and <br />there is little to no room between the bike path and their property. Another concern with <br />transplanting large trees is that they need to have a lot of water so staff would like some <br />assurance from property owners that they would assist with watering the trees. <br /> <br />Mayor Gamec stated that he would be in favor of planting the larger evergreens. He inquired if <br />staff had an estimate on the total cost. <br /> <br />Public Works Committee/August 21, 2001 <br /> Page 2 of 11 <br /> <br /> <br />