My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 08/27/2026
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2026
>
Agenda - Planning Commission - 08/27/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2026 1:18:57 PM
Creation date
8/21/2026 11:59:00 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
08/13/2026 10:06 AM <br />1.11 - GP - RRR.pdf V2 - Changemark Notes (2 Notes ) <br />1 - Floodplain Creation <br />Created by: Chris Anderson <br />On: 08/07/2026 01:43 PM <br />It appears that this area of 65,700 cf floodplain creation is already within the mapped floodway. <br />Is this just being dug deeper? How is this creating floodplain if already in the mapped floodway? <br />0 Replies <br />2 - 3:1 Slope Reinforcement <br />Status as of 08/09/2026 10:36 PM <br />Type: Action <br />State: For Discussion <br />Created by: Joe Feriancek <br />O n : 08/09/2026 10:36 PM <br />Type: Action <br />State: For Discussion <br />We may ask for some type of reinforcement for the 3:1 slopes coming off the back of curb down <br />to wetland or retaining walls. Some type of erosion control mat may be required. We can discuss <br />in more detail during final design. <br />0 Replies <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.