Laserfiche WebLink
Terms & Conditions <br />Contract: Seller's Copy of signed quote represents the contract between Seller and Buyer. This form supersedes all previous <br />communications and negotiations and constitutes the entire agreement between the parties. Any changes to this contract <br />are not binding unless jointly agreed in writing via Change Order. <br />Proiect Scope (This Section For Quotes Including Installation) <br />Inclusions: <br />• One Mobilization <br />• Accepting & Unloading of Order Prior to Installation <br />• Unpacking of Play Equipment <br />• Assembly of Play Equipment <br />• Placing, Digging or Surface Mounting Equipment (as specified) <br />• Concrete for Play Equipment Footings <br />• Standard Insurance Offer (Detail Provided Upon Request) <br />• Standard Warranty Offer (Detail Provided Upon Request) <br />• Standard Wage Rates <br />Exclusions (Unless Specifically Quoted): <br />• Storage or Security of Equipment <br />• Private Utility Locates (irrigation, low voltage, lighting, etc.) <br />• Additional Labor Due to Site Access. Require 8' Wide Clearance from Staging Area to Play Space. <br />• Additional Labor and/or Related Costs Due to Subsurface Conditions (Rock, Hardpan, Heavy Clay, Ground Water, etc.) <br />• Additional Labor and/or Related Costs Due to Working in Unstable Soils (Sand, Pea Rock, Mud, Poor Site Drainage, etc.) <br />• Offsite Removal of Spoils From Footing Holes or Other Excavation. Can be stockpiled for owner removal or left in play space <br />• Disposal of Packing Material. Can be Stockpiled for Owner Removal or Deposited in Owners Onsite Dumpster <br />• Removal of Existing Play Equipment, Border or Safety Surfacing Material <br />• Site Work of Any Kind. Exclusions include, site grading (owner to provide max slope of 1%), site restoration, drainage, etc. <br />• Border for Play Space <br />• Bonding of Any Type <br />• Permits of Any Kind <br />Acceptance of Quotation: <br />Accepted By (Print) <br />Signature: Date: <br />Purchase Amount: $51,137.64 <br />flagshi)11k. <br />&-ecreation <br />Page 2 of 2 <br />