My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/25/2026
Ramsey
>
Public
>
Agendas
>
Council
>
2026
>
Agenda - Council - 08/25/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2026 10:38:54 AM
Creation date
8/25/2026 10:03:21 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/25/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL SPECIFICATIONS <br />Remove and recycle existing play equipment and associated appurtenances <br />and design and install new playground appropriate for a neighborhood park. <br />Prequalification's: <br />I. Bidder/Contactor shall demonstrate that he/she has successfully installed 3 (three) <br />similar playgrounds in a county, municipal or school setting in the Twin Cities <br />Metropolitan area within the last 5 (five) years. <br />II. Bidder/Contractor shall not be disbarred or disqualified from working on <br />playground related construction projects by any municipality, county or school <br />districts in the State of Minnesota. <br />Introduction and General Information: <br />• In submitting a proposal, the Contractor warrants that mobilization and material <br />handling necessary to install ALL play equipment and improvements as proposed <br />is wholly included in their proposal. <br />• Contractor responsible for viewing the existing site, to review the scope of <br />removals, and infrastructure to remain and protect. <br />• Before any construction activities begin, the Contractor must request all required utility <br />locates and take necessary precautions to prevent damage to existing underground <br />utilities. <br />• This Request for Proposal shall be a not -to -exceed amount. The Contractor must <br />include within his/her quote any time or materials necessary to complete the work <br />in a professional and quality manner. E.g. if matting is required due to wet <br />conditions or to protect trail surfaces and tree rooting zones — this expense is that <br />of the Contractor. There will be no Change Orders. <br />• Work site may be required to be enclosed with temporary safety fencing —if the <br />contractor is not physically on site. Fencing is not required if there are no <br />equipment or loose items/tools anywhere on site, aside from loose major play <br />components that do not constitute a hazard, and/or plywood/work mats (if <br />used), which may be present until job completion. <br />• The City plans to save, and reuse the existing containment boulders. The <br />Contractor may change the border layout, if necessary, but will be at the <br />Contractors expense. <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.