Laserfiche WebLink
Progress Estimate - Unit Price Work <br />Contractor's Application for Payment <br />Owner: <br />Engineer: <br />Contractor: <br />Project: <br />Contract: <br />City of Ramsey <br />Ownei s Project No.: <br />Engineer's Project No.: <br />Contractors Project No.: <br />Agency's Project No.: <br />26-01 <br />Bolton & Menk, Inc. <br />25X.138779,26X.142868 <br />North Valley, Inc. <br />2026 Bunker Lake Boulevard Reconstruction <br />SAP 199-121-003 <br />Application No.: 3 Application Period: From 07;01/26 to 07/31/26 Application Date: 08/11/26 <br />A <br />B <br />C D E F <br />F1 F2 <br />G H <br />I <br />1 <br />K <br />L <br />eid Item <br />No. <br />Description <br />Contract Information <br />Previous Estimate <br />Work Completed <br />Materials Currently Stored <br />(not in G) <br />(5) <br />Work Completed <br />and Materials <br />Stored to Date <br />(H ♦ 1) <br />(5) <br />%of <br />Value of <br />Item <br />(1 / F) <br />(%) <br />Balance to Finish (F <br />-1) <br />($) <br />Item Quantity <br />Unit <br />Unit Price <br />($) <br />Value of Bid Item <br />(CX El <br />(5) <br />Quantity Previous <br />Estimate <br />Value Previous <br />Estimate <br />Estimated <br />Quantity <br />Incorporated In <br />the Work <br />Value of Work <br />Completed to Date <br />(E X G) <br />(5) <br />50 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL <br />29.00 <br />UN FT <br />820.52 <br />23,795.08 <br />40.92 <br />33,575.68 <br />40.92 <br />33,575.68 <br />33,575.68 <br />141% <br />(9,780.60) <br />51 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 <br />29.00 <br />LIN FT <br />733.58 <br />21,273.82 <br />28.00 <br />20,540.24 <br />28.00 <br />20,540.24 <br />20,540.24 <br />97% <br />733.58 <br />52 <br />RANDOM WRAP CLASS III <br />35.00 <br />CU VD <br />135.85 <br />4,754.75 <br />35.00 <br />4,754.75 <br />35.00 <br />4,754,75 <br />4,754.75 <br />100% <br />53 <br />INSTALL RANDOM RIPRAP <br />12.00 <br />CU 'ID <br />38.04 <br />456.48 <br />12.00 <br />456.48 <br />12.00 <br />456.4E <br />456.4B <br />100% <br />54 <br />4" CONCRETE WALK <br />1,650.00 <br />SQ FT <br />6.68 <br />11,022.00 <br />1,637.00 <br />10,935.16 <br />1,650.00 <br />11,022.00 <br />11,022.00 <br />100% <br />- <br />55 <br />CONCRETE CURB RAMP WALK <br />600.00 <br />SQ FT <br />16.85 <br />10,110.00 <br />600.00 <br />10,110.00 <br />600.00 <br />10,110.00 <br />10,110.00 <br />100%r <br />- <br />56 <br />CONCRETE CURB AND GUTTER DESIGN 13618 <br />3,485.00 <br />LIN FT <br />18.91 <br />65,901.35 <br />2,950.00 <br />55,784.50 <br />3,051.00 <br />57,694.41 <br />57,694.41 <br />88% <br />8.206.99 <br />57 <br />7" CONCRETE VALLEY GUTTER <br />65.00 <br />50 YD <br />119.76 <br />7,784.40 <br />65.00 <br />7,784.40 <br />65.00 <br />7,784.40 <br />7,784.40 <br />100% <br />- <br />58 <br />TRUNCATED DOMES <br />140.00 <br />SO FT <br />54.34 <br />7,607.60 <br />40.00 <br />2,173.60 <br />40.00 <br />2,173.60 <br />2,173.60 <br />29% <br />5,434,00 <br />59 <br />HANDHOLE TYPE PVC HD COVER <br />1.00 <br />EACH <br />2,445.27 <br />2,445.27 <br />1.00 <br />2,445.27 <br />1.00 <br />2,445.27 <br />2,445.27 <br />100% <br />60 <br />2" NON-METALLIC CONDUIT <br />240.00 <br />LIN FT <br />6.25 <br />1,500.00 <br />310.00 <br />1,937.50 <br />310,00 <br />1,937.50 <br />1,937.50 <br />129% <br />(437.50) <br />61 <br />TRAFFIC CONTROL <br />1.00 <br />LUMP SUM <br />2,934.32 <br />2,934.32 <br />1.00 <br />2,934.32 <br />1.00 <br />2,934.32 <br />2,934.32 <br />100% <br />- <br />62 <br />RIGID PVC LOOP DETECTOR 6'x6' <br />12.00 <br />EACH <br />1,222.63 <br />14,671.56 <br />12.00 <br />14,671.56 <br />12,00 <br />14,671.56 <br />14,671.56 <br />100% <br />- - <br />63 <br />STABILIZED CONSTRUCTION EXIT <br />1.00 <br />LUMP SUM <br />1,358.48 <br />1,358.48 <br />1.00 <br />1,358.48 <br />1.00 <br />1,358,48 <br />1,358.48 <br />100% <br />- <br />64 <br />STORM DRAIN INLET PROTECTION <br />49.00 <br />EACH <br />146.72 <br />7,189.28 <br />49,00 <br />7,189.28 <br />49.00 <br />7,189.28 <br />7,189.28 <br />100% <br />- <br />65 <br />SILT FENCE, TYPE MS <br />500.00 <br />LIN FT <br />2.45 <br />1,225.00 <br />135.00 <br />330.75 <br />135.00 <br />330,75 <br />330.75 <br />27% <br />894.25 <br />66 <br />SEDIMENT CONTROL LOG TYPE WOOD FIBER <br />800.00 <br />LIN FT <br />3.10 <br />2,480,00 <br />620,00 <br />1,922.00 <br />620.00 <br />1,922.00 <br />1,922.00 <br />78% <br />558.00 <br />67 <br />COMMON TOPSOIL BORROW <br />100.00 <br />CU YD <br />27.17 <br />2,717.00 <br />- <br />- <br />96.00 <br />2,608.32 <br />2,608.32 <br />96% <br />108.68 <br />68 <br />FERTILIZER TYPE 3 <br />750.00 <br />POUND <br />1,03 <br />772,50 <br />700.00 <br />721.00 <br />700.00 <br />721.00 <br />721.00 <br />93% <br />51.50 <br />69 <br />ROLLED EROSION PREVENTION CATEGORY 20 <br />12,100.00 <br />SO YD <br />1.74 <br />21,054.00 <br />11,761.20 <br />20,464.49 <br />11,761.20 <br />20,464.49 <br />20,464.49 <br />97% <br />589.51 <br />70 <br />SEEDING <br />3.00 <br />ACRE <br />1,086.79 <br />3,260.37 <br />2.43 <br />2,640.90 <br />2.43 <br />2,640.90 <br />2,640.90 <br />81% <br />619.47 <br />71 <br />RAPID STABILIZATION METHOD 2 <br />3.00 <br />ACRE <br />2,608.29 <br />7,824.87 <br />- <br />- <br />2.10 <br />5,477.41 <br />5,477.41 <br />70% <br />2,347.46 <br />72 <br />WEED SPRAYING <br />2.00 <br />ACRE <br />271.70 <br />543.40 <br />- <br />• <br />2.00 <br />543.40 <br />543.40 <br />100% <br />- <br />73 <br />WEED SPRAY MIXTURE <br />0.30 <br />GAL <br />108.67 <br />32.60 <br />- <br />- <br />030 <br />32.60 <br />32.60 <br />100% <br />- <br />74 <br />WATER <br />800.00 <br />MGAL <br />1.09 <br />872,00 <br />200.00 <br />218.00 <br />810.00 <br />882.90 <br />882.90 <br />101% <br />110.90) <br />75 <br />SEED SOUTHERN BOULEVARD <br />55.00 <br />POUND <br />5.43 <br />298.65 <br />- <br />- <br />- <br />- <br />- <br />298.65 <br />76 <br />SEED MESIC INSLOPE <br />220.00 <br />POUND <br />8.69 <br />1,911.80 <br />210.00 <br />1,824.90 <br />210.00 <br />1,824.90 <br />1,824.90 <br />95% <br />86.90 <br />77 <br />4" SOLID LINE MULTI- COMPONENT <br />11,000.00 <br />LIN FT <br />0.54 <br />5,940.00 <br />11,000.00 <br />5,940.00 <br />11,000.00 <br />5,940.00 <br />5,940.00 <br />100% <br />- <br />78 <br />4" BROKEN LINE MULTI -COMPONENT <br />1,000.00 <br />LIN FT <br />0.54 <br />540.00 <br />1,000.00 <br />590.00 <br />1,000.00 <br />540.00 <br />540.00 <br />100% <br />- <br />79 <br />4" DOUBLE SOLID LINE MULTI -COMPONENT <br />400,00 <br />LIN FT <br />1.09 <br />436.00 <br />400.00 <br />436.00 <br />400.00 <br />436.00 <br />436.00 <br />100% <br />- <br />80 <br />24" SOLID LINE MULTI -COMPONENT <br />180.00 <br />LIN FT <br />9.78 <br />1,760.40 <br />180.00 <br />1,760.40 <br />180.00 <br />1,760.40 <br />1,760.40 <br />10096 <br />81 <br />24" SOLID LINE PREFORM THERMO GROUND IN ENHANCED <br />50.00 <br />UN FT <br />27.17 <br />1,358.50 <br />50.00 <br />1,358.50 <br />50.00 <br />1,358.50 <br />1,358.50 <br />100% <br />82 <br />CROSSWALK PREFORM THERMO GROUND IN ENHANCED SKID <br />300.00 <br />SQFT <br />15.22 <br />4,566.00 <br />300.00 <br />4,566.00 <br />300.00 <br />4,566.00 <br />4,566.00 <br />100% <br />83 <br />PAVEMENT MESSAGE MULTI -COMPONENT <br />378.00 <br />SQ FT <br />10.87 <br />4,108.86 <br />378.00 <br />4,108.86 <br />378.00 <br />4,108.86 <br />4,108.86 <br />100% <br />Original Contract Totals <br />$ 1.066,382.87 <br />$ 1,013,69184 <br />$ 1.051.213.22 <br />$ - <br />$ 1,051,213.22 <br />99% <br />$ 15,169,65 <br />FUNDING SOURCE --> <br />TIF 18 (56% OF STREET) --> <br />MSA FUNDS --> <br />COMPLETE TO DATE <br />$459,975.72 <br />$361,409.49 <br />TIF 18 (56% OF WATER) --> $48,540.72 <br />WATER UTILITY --> $38,139.14 <br />TIF 18 (56% OF STORM) --> $80,162.97 <br />STORM WATER --> $62,985.18 <br />TOTAL FUNDS $1,051,213.22 <br />Unit Price <br />RETAINAGE (1%) <br />$4,599.76 <br />$3,614.09 <br />$485.41 <br />$381.39 <br />$801.63 <br />$629.85 <br />PREVIOUS PAYMENTS <br />$444,119.20 <br />$348,950.80 <br />$43,942.63 <br />$34,526.36 <br />$73,928.92 <br />$58,087.01 <br />$10,512.13 $1,003,554.92 <br />EJCDC 0620 Contractor's Application for Payment <br />lc) 2018 National Society of Professional Engineers for E2CDC. All rights reserved. <br />• AMOUNT DUE • <br />• $11,256.76 <br />• $8,844.60 <br />_ $4,112.68 <br />_ $3,231.39 <br />• $5,432.42 <br />• $4,268.32 <br />2 of2 <br />