Laserfiche WebLink
Flintwood Hills 2nd & 3rd Street Reconstructions <br />I.P. 26-05 <br />Estimate No. 3 <br />Period Ending <br />Partial <br />July 31, 2026 <br />CONTRACT AMOUNT <br />COMPLETED THIS PERIOD <br />COMPLETED TO DATE <br />Item No. <br />MnDONo T <br />Item Description <br />Unit <br />Estimated <br />Quantity <br />Unit Price <br />Extended Total <br />Quantity <br />Extended Total <br />Quantity <br />Extended Total <br />1 <br />2021.501 <br />MOBILIZATION <br />LS <br />1.0 <br />$ 85,808.53 <br />$ 85,808.53 <br />0.0 <br />$ - <br />1.0 <br />$ 85,808.53 <br />2 <br />2104.502 <br />REMOVE CATCH BASIN <br />EA <br />1.00 <br />$ 616.37 <br />$ 616.37 <br />0.00 <br />$ - <br />1.0 <br />$ 616.37 <br />3 <br />2104.502 <br />SALVAGE MAIL BOX SUPPORT <br />EA <br />98.00 <br />$ 81.21 <br />$ 7,958.58 <br />0 <br />$ - <br />98 <br />$ 7,958.58 <br />4 <br />2104.503 <br />SAWING BITUMINOUS PAVEMENT- FULL DEPTH <br />LF <br />1361 <br />$ 2.00 <br />$ 2,722.00 <br />39 <br />$ 78.00 <br />.1431 <br />$ 2,862.00 <br />5 <br />2104.503 <br />SAWING CONCRETE PAVEMENT- FULL DEPTH <br />LF <br />727 <br />$ 5.25 <br />$ 3,816.75 <br />0 <br />$ - <br />609 <br />$ 3,197.25 <br />6 <br />7 <br />2104.503 <br />2104.503 <br />REMOVE CURB AND GUTTER <br />LF <br />LF <br />8091 <br />27 <br />$ 2.62 <br />$ 21,198.42 <br />10 <br />$ 26.20 <br />7560 <br />$ 19,807.20 <br />REMOVE PIPE - STORM SEWER <br />$ 13.33 <br />0 <br />$ - <br />27 <br />$ 359.91 <br />$ 359.91 <br />8 <br />2104.503 <br />REMOVE BITUMINOUS CURBING <br />LF <br />217 <br />$ 1.08 <br />$ 234.36 <br />0 <br />$ - <br />217 <br />$ 234.36 <br />9 <br />2104.504 <br />REMOVE BITUMINOUS PAVEMENT -TRAILS <br />SY <br />11 <br />$ 23.82 <br />$ 262.02 <br />0 <br />$ - <br />11 <br />$ 262.02 <br />10 <br />2104.504 <br />REMOVE BITUMINOUS PAVEMENT- DRIVEWAYS <br />SY <br />1054 <br />$ 6.17 <br />$ 6,503.18 <br />268 <br />$ 1,653.56 <br />1146 <br />$ 7,070.82 <br />11 <br />2104.504 <br />REMOVE CONCRETE PAVEMENT - DRIVEWAYS <br />SY <br />569 <br />$ 10.77 <br />$ 6,128.13 <br />0 <br />$ - <br />633 <br />$ 6,817.41 <br />12 <br />2104.504 <br />REMOVE CONCRETE VALLEY GUTTER <br />SY <br />23 <br />$ 24.90 <br />S 572.70 <br />0 <br />$ - <br />23 <br />$ 572.70 <br />13 <br />2105.607 <br />SUBGRADE EXCAVATION, REMOVE UNSUITABLE MATERIALS <br />(EV) <br />CY <br />1387 <br />$ 1.08 <br />S 1,497.96 <br />0 <br />$ <br />503 <br />$ 543.24 <br />14 <br />2106.507 <br />COMMON EXCAVATION (EV) <br />CY <br />654 <br />$ 0.22 <br />S 143.88 <br />40 <br />$ 8.80 <br />694 <br />$ 152.68 <br />15 <br />2106.607 <br />HAUL & STOCKPILE RECLAIM MATERIAL (LV) <br />CY <br />3005 <br />$ 0.22 <br />$ 661.10 <br />0 <br />$ - <br />3005 <br />$ 661.10 <br />16 <br />2112.519 <br />SUBGRADE PREPARATION <br />RDST <br />43 <br />$ 250.50 <br />$ 10,771.50 <br />0 <br />$ - <br />43 <br />$ 10,771.50 <br />17 <br />2123.61 <br />STREET SWEEPER (WITH PICKUP BROOM) <br />HOUR <br />20 <br />$ 200.32 <br />$ 4,006.40 <br />9 <br />$ 1,802.88 <br />31 <br />$ 6,209.92 <br />18 <br />2130.523 <br />WATER FOR DUST CONTROL <br />MGAL <br />40 <br />$ 45.48 <br />$ 1,819.20 <br />0 <br />$ - <br />58 <br />$ 2,637.84 <br />19 <br />2211.507 <br />AGGREGATE BASE CLASS 5 - MODIFIED (CV) <br />CY <br />2230 <br />$ 0.11 <br />$ 245.30 <br />2193 <br />$ 241.23 <br />2230 <br />$ 245.30 <br />20 <br />2215.504 <br />FULL DEPTH RECLAMATION <br />SY <br />13314 <br />$ 5.71 <br />$ 76,022.94 <br />0 <br />$ - <br />13314 <br />$ 76,022.94 <br />21 <br />2232.504 <br />MILL BITUMINOUS PAVEMENT (2.0") <br />SY <br />36 <br />$ 12.99 <br />$ 467.64 <br />36 <br />$ 467.64 <br />36 <br />$ 467.64 <br />22 <br />2357.506 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />GAL <br />937 <br />$ 3.09 <br />$ 2,895.33 <br />845 <br />$ 2,611.05 <br />845 <br />$ 2,611.05 <br />23 <br />2360.504 <br />TYPE SP 9.5 WEARING COURSE MIXTURE (3,C) - DRIVEWAYS <br />SY <br />1033 <br />$ 21.34 <br />$ 22,044.22 <br />1117 <br />$ 23,836.78 <br />1117 <br />$ 23,836.78 <br />24 <br />2360.509 <br />TYPE SP 12.5 NON WEARING COURSE MIXTURE (3,C) 2.0" <br />TON <br />1512 <br />$ 81.20 <br />$ 122,774.40 <br />12 <br />$ 974.40 <br />1470 <br />$ 119,364.00 <br />25 <br />2360.509 <br />TYPE SP 9.5 WEARING COURSE MIXTURE (3,C) 1.5" <br />TON <br />1134 <br />$ 85.58 <br />$ 97,047.72 <br />1233.4 <br />$ 105,554.37 <br />1233.4 <br />$ 105,554.37 <br />26 <br />2501.503 <br />15" RC PIPE SEWER DESIGN 3006 CLASS III <br />LF <br />28 <br />$ 111.06 <br />$ 3,109.68 <br />0 <br />$ - <br />28 <br />$ 3,109.68 <br />27 <br />2503.602 <br />RESET CATCH BASIN CASTING <br />EA <br />12 <br />$ 254.46 <br />$ 3,053.52 <br />0 <br />$ - <br />12 <br />$ 3,053.52 <br />28 <br />2504.602 <br />ADJUST VALVE BOX <br />EA <br />12 <br />$ 477.55 <br />S 5,730.60 <br />0 <br />$ - <br />16 <br />$ 7,640.80 <br />29 <br />2504.602 <br />VALVE BOX SECTION <br />EA <br />6 <br />$ 149.93 <br />$ 899.58 <br />0 <br />$ - <br />19 <br />$ 2,848.67 <br />30 <br />2506.502 <br />ADJUST FRAME & RING CASTING <br />EA <br />21 <br />$ 888.46 <br />S 18,657.66 <br />0 <br />$ - <br />21 <br />$ 18,657.66 <br />31 <br />2506.502 <br />CASTING ASSEMBLY (STORM) <br />EA <br />1 <br />$ 990.76 <br />S 990.76 <br />0 <br />$ - <br />1 <br />$ 990.76 <br />32 <br />2506.502 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 2'X3' <br />EA <br />1 <br />$ 3,109.60 <br />S 3,109.60 <br />0 <br />$ - <br />1 <br />$ 3,109.60 <br />33 <br />2521.518 <br />6" CONCRETE WALK <br />SY <br />11 <br />$ 77.96 <br />S 857.56 <br />6 <br />$ 467.76 <br />6 <br />$ 467.76 <br />34 <br />2521.602 <br />DRILL & GROUT REINFORCEMENT BAR (EPDXY COATED) <br />EA <br />7 <br />$ 21.66 <br />$ 151.62 <br />7 <br />$ 151.62 <br />7 <br />$ 151.62 <br />35 <br />2531.503 <br />CONCRETE CURB & GUTTER DESIGN B618 <br />LF <br />493 <br />$ 26.53 <br />$ 13,079.29 <br />0 <br />$ - <br />547 <br />$ 14,511.91 <br />36 <br />2531.503 <br />CONCRETE CURB & GUTTER DESIGN SURMOUNTABLE <br />LF <br />8313 <br />$ 17.87 <br />$ 148,553.31 <br />10 <br />$ 178.70 <br />7834 <br />$ 139,993.58 <br />37 <br />2531.504 <br />6" CONCRETE PAVEMENT - DRIVEWAYS <br />SY <br />576 <br />$ 67.13 <br />S 38,666.88 <br />0 <br />$ - <br />596 <br />$ 40,009.48 <br />38 <br />2531.604 <br />7" CONCRETE VALLEY GUTTER <br />SY <br />66 <br />$ 87.71 <br />S 5,788.86 <br />0 <br />$ - <br />20 <br />$ 1,754.20 <br />Pay Estimate Page 2 of 3 <br />