Laserfiche WebLink
Section 01 Unplatted <br />I.P. 26-07 <br />Estimate No. 2 Partial <br />Period Ending July 31, 2026 <br />CONTRACT AMOUNT <br />COMPLETED THIS PERIOD <br />COMPLETED TO DATE <br />Item No. <br />MnDONo T <br />Item Description <br />Unit <br />Estimated <br />Quantity <br />Unit Price <br />Extended Total <br />Quantity <br />Extended Total <br />Quantity <br />Extended Total <br />1 <br />2021.501 <br />MOBILIZATION <br />LS <br />1.0 <br />$ 28,222.60 <br />$ 28,222.60 <br />0.25 <br />$ 7,055.65 <br />0.75 <br />$ 21,166.95 <br />2 <br />2101.505 <br />CLEARING <br />ACRE <br />0.20 <br />$ 24,666.85 <br />$ 4,933.37 <br />0.15 <br />$ 3,700.03 <br />0.35 <br />$ 8,633.40 <br />3 <br />2101.505 <br />GRUBBING <br />ACRE <br />0.20 <br />$ 5,976.55 <br />$ 1,195.31 <br />0.15 <br />$ 896.48 <br />0.35 <br />$ 2,091.79 <br />4 <br />2104.502 <br />SALVAGE MAIL BOX SUPPORT <br />EA <br />46 <br />$ 81.50 <br />$ 3,749.00 <br />0 <br />$ - <br />46 <br />$ 3,749.00 <br />5 <br />2104.503 <br />REMOVE STORM SEWER <br />LF <br />555 <br />$ 13.04 <br />$ 7,237.20 <br />0 <br />$ - <br />535 <br />$ 6,976.40 <br />6 <br />2104.503 <br />SAWING BITUMINOUS PAVEMENT- FULL DEPTH <br />LF <br />750 <br />$ 2.12 <br />$ 1,590.00 <br />0 <br />$ - <br />750 <br />$ 1,590.00 <br />7 <br />2104.503 <br />SAWING CONCRETE PAVEMENT- FULL DEPTH <br />LF <br />230 <br />$ 4.59 <br />$ 1,055.70 <br />40 <br />$ 183.60 <br />270 <br />$ 1,239.30 <br />8 <br />2104.503 <br />REMOVE BITUMINOUS CURB <br />LF <br />3150 <br />$ 0.54 <br />$ 1,701.00 <br />0 <br />$ - <br />3150 <br />$ 1,701.00 <br />9 <br />2104.504 <br />REMOVE BITUMINOUS PAVEMENT- DRIVEWAYS <br />SY <br />530 <br />$ 5.51 <br />$ 2,920.30 <br />0 <br />$ - <br />573 <br />$ 3,157.23 <br />10 <br />2104.504 <br />REMOVE CONCRETE PAVEMENT - DRIVEWAYS <br />SY <br />240 <br />$ 11.21 <br />$ 2,690.40 <br />0 <br />$ - <br />273 <br />$ 3,060.33 <br />11 <br />2104.504 <br />REMOVE GRAVEL SURFACE - DRIVEWAYS <br />SY <br />130 <br />$ 2.41 <br />$ 313.30 <br />0 <br />$ - <br />130 <br />$ 313.30 <br />12 <br />2104.504 <br />REMOVE BITUMINOUS FLUME <br />SY <br />15 <br />$ 29.34 <br />$ 440.10 <br />0 <br />$ - <br />15 <br />$ 440.10 <br />13 <br />2104.507 <br />REMOVE RIPRAP <br />CY <br />16 <br />$ 19.56 <br />$ 312.96 <br />0 <br />$ - <br />16 <br />$ 312.96 <br />14 <br />2105.507 <br />GEOTEXTILE FABRIC TYPE 4 <br />SY <br />180 <br />$ 3.26 <br />$ 586.80 <br />0 <br />$ - <br />. 0 <br />$ - <br />15 <br />2105.607 <br />COMMON EXCAVATION (EV) <br />CY <br />1600 <br />$ 21.54 <br />$ 34,464.00 <br />64 <br />$ 1,378.56 <br />1024 <br />$ 22,056.96 <br />16 <br />2105.607 <br />SUBGRADE EXCAVATION, REMOVE UNSUITABLE <br />MATERIALS (EV) <br />CY <br />5700 <br />$ 21.43 <br />$ 122,151.00 <br />240 <br />$ 5,143.20 <br />1024 <br />$ 21,944.32 <br />17 <br />2106.507 <br />SELECT GRANULAR BORROW (CV) <br />CY <br />4600 <br />$ 23.23 <br />$ 106,858.00 <br />0 <br />$ - <br />0 <br />$ - <br />18 <br />2106.607 <br />HAUL & STOCKPILE RECLAIM MATERIAL (LV) <br />CY <br />4700 <br />$ 13.75 <br />$ 64,625.00 <br />0 <br />$ - <br />4715 <br />$ 64,831.25 <br />19 <br />2112.519 <br />SUBGRADE PREPARATION <br />RDST <br />75 <br />$ 251.42 <br />$ 18,856.50 <br />0 <br />$ - <br />75 <br />$ 18,856.50 <br />20 <br />2123.61 <br />STREET SWEEPER (WITH PICKUP BROOM) <br />HOUR <br />20 <br />$ 201.03 <br />$ 4,020.60 <br />8 <br />$ 1,608.24 <br />21 <br />$ 4,221.63 <br />21 <br />2130.523 <br />WATER FOR DUST CONTROL <br />MGAL <br />50 <br />$ 46.73 <br />$ 2,336.50 <br />67 <br />$ 3,130.91 <br />78 <br />$ 3,644.94 <br />22 <br />2211.507 <br />AGGREGATE BASE CLASS 5 - MODIFIED (CV) <br />CY <br />3450 <br />$ 15.39 <br />$ 53,095.50 <br />0 <br />$ - <br />3416 <br />$ 52,572.24 <br />23 <br />2215.504 <br />FULL DEPTH RECLAMATION <br />SY <br />20100 <br />$ 1.42 <br />$ 28,542.00 <br />0 <br />$ - <br />20100 <br />$ 28,542.00 <br />24 <br />2232.504 <br />MILL BITUMINOUS PAVEMENT (2.0") <br />SY <br />50 <br />$ 7.61 <br />$ 380.50 <br />0 <br />$ - <br />21 <br />$ 159.81 <br />25 <br />2357.506 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />GAL <br />1450 <br />$ 0.11 <br />$ 159.50 <br />30 <br />$ 3.30 <br />30 <br />$ 3.30 <br />26 <br />2360.509 <br />TYPE SP 12.5 NON WEARING COURSE MIXTURE (3,C) <br />2.0" <br />TON <br />2350 <br />$ 83.47 <br />$ 196,154.50 <br />0 <br />$ - <br />2239 <br />$ 186,889.33 <br />27 <br />2360.509 <br />TYPE SP 9.5 WEARING COURSE MIXTURE (3,C) 1.5" <br />TON <br />1750 <br />$ 87.84 <br />$ 153,720.00 <br />0 <br />$ - <br />0 <br />$ - <br />28 <br />2360.509 <br />TYPE SP 9.5 WEARING COURSE MIXTURE (3,C) <br />SY <br />500 <br />$ 27.49 <br />$ 13,745.00 <br />583 <br />$ 16,026.67 <br />583 <br />$ 16,026.67 <br />DRIVEWAYS <br />29 <br />2411.502 <br />CONCRETE FLUME <br />SY <br />24 <br />$ 97.80 <br />$ 2,347.20 <br />0 <br />$ - <br />24 <br />$ 2,347.20 <br />30 <br />2501.502 <br />15" RC PIPE APRON <br />EA <br />14 <br />$ 814.98 <br />$ 11,409.72 <br />0 <br />$ - <br />14 <br />$ 11,409.72 <br />31 <br />2501.502 <br />18" RC PIPE APRON <br />EA <br />10 <br />$ 1,032.31 <br />$ 10,323.10 <br />0 <br />$ - <br />10 <br />$ 10,323.10 <br />32 <br />2501.502 <br />18" CMP APRON <br />EA <br />2 <br />$ 380.33 <br />$ 760.66 <br />0 <br />$ - <br />0 <br />$ - <br />33 <br />2501.503 <br />15" RC PIPE SEWER DESIGN 3006 CLASS III <br />LF <br />304 <br />$ 81.50 <br />$ 24,776.00 <br />0 <br />$ - <br />304 <br />$ 24,776.00 <br />34 <br />2501.503 <br />18" RC PIPE SEWER DESIGN 3006 CLASS III <br />LF <br />220 <br />$ 81.50 <br />$ 17,930.00 <br />0 <br />$ - <br />220 <br />$ 17,930.00 <br />35 <br />2501.503 <br />18" CMP PIPE CULVERT <br />LF <br />18 <br />$ 63.03 <br />$ 1,134.54 <br />0 <br />$ - <br />0 <br />$ - <br />36 <br />2501.602 <br />TRASH GUARD FOR 18" PIPE APRON <br />EA <br />10 <br />$ 565.06 <br />$ 5,650.60 <br />0 <br />$ - <br />10 <br />$ 5,650.60 <br />37 <br />2503.503 <br />CLEAN AND VIDEO SEWER <br />LF <br />686 <br />$ 15.21 <br />$ 10,434.06 <br />686 <br />$ 10,434.06 <br />686 <br />$ 10,434.06 <br />38 <br />2506.502 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 <br />EA <br />4 <br />$ 4,129.26 <br />$ 16,517.04 <br />0 <br />$ - <br />4 <br />$ 16,517.04 <br />Pay Estimate Page 2 of 3 <br />