Laserfiche WebLink
2026 Neighborhood Pavement Overlay Improvements <br />I.P. 26-08 <br />Estimate No. 1 <br />Period Ending <br />Partial <br />July 31, 2026 <br />CONTRACT AMOUNT <br />COMPLETED THIS PERIOD <br />COMPLETED TO DATE <br />Item No. <br />MnDOT <br />No. <br />Item Description <br />Unit <br />Estimated <br />Quantity <br />Unit Price <br />Extended Total <br />Quantity <br />Extended Total <br />Quantity <br />Extended Total <br />1 <br />2021.501 <br />MOBILIZATION <br />LS <br />1.0 <br />S 34,228.35 <br />$ 34,228.35 <br />0.5 <br />5 17.114.18 <br />0.5 <br />S 17,114.18 <br />2 <br />2104.503 <br />SAWING CONCRETE PAVEMENT (FULL DEPTH) <br />LF <br />160.00 <br />$ 6.51 <br />5 1,041.60 <br />25 <br />S 162.75 <br />25 <br />5 162.75 <br />3 <br />2104.503 <br />SAWING BITUMINOUS PAVEMENT (FULL DEPTH) <br />LF <br />1230.00 <br />S 2.01 <br />5 2,472.30 <br />555 <br />S 1,115.55 <br />555 <br />S 1,115.55 <br />4 <br />2104.503 <br />REMOVE CURB AND GUTTER <br />LF <br />680 <br />5 13.28 <br />$ 9,030.40 <br />390 <br />$ 5,179.20 <br />390 <br />$ 5,179.20 <br />5 <br />2104.503 <br />REMOVE BITUMINOUS CURB <br />LF <br />150 <br />S 8.68 <br />S 1.302.00 <br />0 <br />$ - <br />0 <br />$ - <br />6 <br />2104.504 <br />REMOVE CONCRETE WALK <br />SY <br />180 <br />$ 15.99 <br />$ 2.878.20 <br />47 <br />S 751.53 <br />47 <br />$ 751.53 <br />7 <br />2104.504 <br />REMOVE BITUMINOUS PAVEMENT <br />SY <br />2895 <br />S 4.10 <br />$ 11,869.50 <br />693 <br />$ 2,841.30 <br />593 <br />$ 2,841.30 <br />8 <br />2123.610 <br />STREET SWEEPER (WITH PICKUP BROOM) <br />HR <br />10 <br />5 0.11 <br />5 1.10 <br />2 <br />S 0.22 <br />2 <br />5 0.22 <br />9 <br />2211.509 <br />AGGREGATE BASE CLASS 5 MODIFIED (CV) <br />TON <br />25 <br />$ 26.58 <br />5 664.50 <br />25 <br />$ 664.50 <br />25 <br />$ 664.50 <br />10 <br />2231.604 <br />BITUMINOUS PATCH SPECIAL 1 <br />SY <br />2110 <br />S 14.29 <br />5 30,151.90 <br />329 <br />5 4,701.41 <br />329 <br />5 4,701.41 <br />11 <br />2231.604 <br />BITUMINOUS PATCH SPECIAL 2 <br />SY <br />520 <br />5 39.74 <br />5 20,664.80 <br />452 <br />5 17,962.48 <br />452 <br />$ 17,962.48 <br />12 <br />2231.604 <br />BITUMINOUS DRIVEWAY PATCH <br />SY <br />25 <br />S 69.92 <br />S 1,748.00 <br />33 <br />$ 2,307.36 <br />33 <br />5 2,307.36 <br />13 <br />2232.504 <br />MILL BITUMINOUS PAVEMENT SURFACE (1.0") <br />SY <br />5820 <br />S 1.43 <br />5 8,322.60 <br />5521 <br />5 7,895.03 <br />5521 <br />S 7,895.03 <br />14 <br />2232.504 <br />MILL BITUMINOUS PAVEMENT SURFACE (2.0") <br />SY <br />18340 <br />S 0.95 <br />S 17,423.00 <br />15171 <br />S 14,412.45 <br />15171 <br />S 14,412.45 <br />15 <br />2231.603 <br />SAWED AND SEALED JOINT <br />EA <br />110 <br />S 21.70 <br />5 2,387.00 <br />103 <br />5 2,235.10 <br />103 <br />5 2,235.10 <br />16 <br />2357.506 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />GAL <br />1720 <br />5 0.54 <br />5 928.80 <br />1350 <br />5 729.00 <br />1350 <br />S 729.00 <br />17 <br />2360.509 <br />TYPE SP 9.5 WEARING COURSE MIXTURE (3,C) <br />TON <br />2900 <br />$ 87.43 <br />5 253,547.00 <br />2191.3 <br />S 191,585.36 <br />2191.3 <br />5 191,585.36 <br />18 <br />2504.602 <br />ADJUST VALVE BOX <br />EA <br />12 <br />S 385.16 <br />5 4,621.92 <br />0 <br />$ - <br />0 <br />S - <br />19 <br />2506.502 <br />REMOVE & REPLACE FRAME & RING CASTING <br />EA <br />4 <br />S 1,321.49 <br />5 5,285.96 <br />1 <br />$ 1,321.49 <br />1 <br />$ 1,321.49 <br />20 <br />2506.502 <br />ADJUST FRAME AND RING CASTING <br />EA <br />24 <br />S 108.50 <br />5 2,604.00 <br />0 <br />S - <br />0 <br />S - <br />21 <br />2506.602 <br />GROUT CATCH BASIN OR MANHOLE <br />EA <br />28 <br />S 396.01 <br />$ 11,088.28 <br />0 <br />S - <br />0 <br />S - <br />22 <br />2506.602 <br />CASTING ASSEMBLY SPECIAL <br />EA <br />1 <br />5 210.98 <br />5 210.98 <br />0 <br />5 - <br />0 <br />S - <br />23 <br />2521.518 <br />6" CONCRETE WALK <br />SY <br />320 <br />$ 58.59 <br />$ 18,748.80 <br />158 <br />S 9,257.22 <br />158 <br />S 9,257.22 <br />24 <br />2521.602 <br />DRILL AND GROUT REIN BAR (EPDXY COATED) <br />EA <br />220 <br />5 10.85 <br />5 2,387.00 <br />50 <br />5 542.50 <br />50 <br />5 542.50 <br />25 <br />2531.503 <br />CONCRETE CURB AND GUTTER DESIGN B618 <br />LF <br />130 <br />5 27.12 <br />5 3,525.60 <br />0 <br />$ - <br />0 <br />5 - <br />26 <br />2531.503 <br />CONCRETE CURB AND GUTTER DESIGN SURMOUNTABLE <br />LF <br />630 <br />S 27.12 <br />S 17,085.60 <br />437 <br />S 11,851.44 <br />437 <br />S 11.851,44 <br />27 <br />2531.618 <br />TRUNCATED DOMES <br />SF <br />144 <br />$ 54.25 <br />S 7,812.00 <br />116 <br />S 6,293.00 <br />116 <br />S 6,293.00 <br />28 <br />2535.503 <br />BITUMINOUS CURB <br />LF <br />150 <br />$ 9.49 <br />5 1,423.50 <br />0 <br />$ - <br />0 <br />5 - <br />29 <br />2563.601 <br />TRAFFIC CONTROL <br />LS <br />1 <br />5 3,471.88 <br />5 3,471.88 <br />0.5 <br />$ 1,735.94 <br />0.5 <br />5 1,735.94 <br />30 <br />2563.601 <br />ALTERNATE PEDESTRIAN ROUTE <br />LS <br />1 <br />S 1.08 <br />5 1.08 <br />0.5 <br />5 0.54 <br />0.5 <br />S 0.54 <br />31 <br />2573.502 <br />STORM DRAIN INLET PROTECTION <br />EA <br />12 <br />5 70.52 <br />S 846.24 <br />11 <br />5 775.72 <br />11 <br />5 775.72 <br />32 <br />2574.507 <br />COMMON TOPSOIL BORROW (LV) <br />CY <br />125 <br />S 59.25 <br />$ 7,406.25 <br />36 <br />$ 2,133.00 <br />36 <br />S 2,133.00 <br />33 <br />2575.523 <br />WATER <br />MGAL <br />10 <br />5 162.74 <br />5 1.627.40 <br />0 <br />$ - <br />0 <br />5 - <br />34 <br />2575.605 <br />TURF ESTABLISHMENT <br />ACRE <br />0.16 <br />5 16,274.44 <br />$ 2,603.91 <br />0.00 <br />S - <br />0.00 <br />$ - <br />35 <br />LANDSCAPE ALLOWANCE <br />UNITS <br />10000 <br />$ 1.00 <br />S 10,000.00 <br />0 <br />S - <br />0 <br />5 - <br />GRAND TOTALS S 499,411.45 <br />S 303,568.27 <br />S 303,568.27 <br />Internal City Use Only <br />PAVEMENT MANAGEMENT FUNDS (0.95 MOB) <br />$ 302.625.76 <br />$ 302,625.76 <br />STORM SEWER UTILITY FUNDS (0.05 MOB) <br />3 942.51 <br />$ 942.51 <br />Total Funds <br />$ 303,568.27 <br />$ 303,566.27 <br />Pay Estimate Page 2 of 2 <br />