Laserfiche WebLink
153+00 <br />6845 <br />154+00 <br />155+00 <br />156+00 <br />157+00 <br />158I+00 <br />159+00 <br />17512 <br />ANOKA COUNTY RIGHT OF WAY <br />160I+00 <br />PID 03-32-25-34-0001 <br />ANOKA COUNTY RIGHT OF WAY <br />MATCH EXISTING <br />SAWCUT FULL -DEPTH (45 LF) <br />+ 161+67 <br />END S.A.P. 199-101-013 <br />STA. 161+27.29 <br />NOWTHEN BOULEVARD (CSAH 5) <br />LEGEND <br />2" MILL & OVERLAY <br />FULL SECTION PAVEMENT <br />PR. GEOGRID <br />PR. B618 CURB <br />PR. RESTORATION <br />PR. DRIVE - BITUMINOUS <br />PR. DRIVE - GRAVEL <br />PR. STORM SEWER PIPE <br />PR. SILT FENCE <br />DRAINAGE & UTILITY EASEMENT LINE <br />RIGHT OF WAY LINE <br />SECTION LINE <br />WETLAND BOUNDARY <br />PR. SAWCUT <br />OH <br />P-BUR <br />OVERHEAD POWER LINE <br />BURIED POWER LINE <br />GAS LINE <br />COMMUNICATION LINE <br />GENERAL NOTES: <br />1. TYPICAL SECTIONS SEE SHEETS 03 - 04. <br />2. REMOVALS WILL BE MARKED IN THE FIELD BY CITY STAFF. ALL REMOVALS MUS BE SAWCUT. <br />3. PROTECT ALL EXISTING PAVEMENT NOT CALLED OUT FOR REMOVAL. <br />4. RESTORE ALL DISTURBED BLVD WITH 4" TOPSOIL, ERO. CONTROL BLANKET AND SEED (MNDOT WET <br />DITCH MIX) UNLESS OTHERWISE NOTED. <br />0 <br />30 <br />60 <br />90 <br />SCALE (FEED <br />DATE <br />REVISION <br />I hereby certify that this plan, specrfication, or report was prepared <br />by me or under my direct supervision and that I am a duly Licensed <br />Professional Engineer uer the law of the Staf f Minnesota <br />Date <br />ACEK <br />Lic No 57095 <br />DESIGNED BY: <br />11F <br />DRAWN BY: <br />11F <br />cnTE <br />5/29/26 <br />CHECKED BY: <br />11F <br />FILE <br />26-02 <br />CITY OF RAMSEY <br />7550 SUNWOOD DRIVE <br />RAMSEY, MN 55303 <br />(763) 427-1410 FAX (763) 433-9898 <br />CONSTRUCTION PLAN <br />S.A.P. 199-101-013 <br />2026 MSA PAVEMENT OVERLAY IMPROVEMENTS <br />CITY PROJECT NO. 26-02 <br />CITY OF RAMSEY, MINNESOTA <br />SHEET <br />19 <br />31 <br />SHEETS <br />