Laserfiche WebLink
CC Regular Session <br />Meeting Date: <br />08/25/2026 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />5. 6. <br />Title: <br />Adopt Resolution #26-182 Authorizing the Replacement of Riverdale Park's Playground <br />Purpose/Background: <br />Late in 2021, City Council approved the Playground Replacement Policy which informs the city generally on <br />which playgrounds are to be replaced and when. In 2022, the city removed two small antiquated play structures <br />that did not merit replacement, and refurbished the playgrounds at both Peltzer and Rabbit Park's pursuant to the <br />policy and plan. Between 2023 and 2024 the playground at River's Bend was refurbished and Alpine Park's was <br />replaced and greatly expanded. In 2025, Central Park was also replaced with a significant expansion in scope and <br />play components at a cost of $449,000. <br />In summary, the city remains on track in replacing one playground each year, consistent with the policy. As part <br />of the approval of the 2026-2035 Capital Improvement Plan, the estimated cost of the annual playground <br />replacements rose from $100k to an estimated $125k. This target amount was an estimate for the 2026 <br />playground replacement —and the RFP process was understood to determine if $125k would be adequate for the <br />near -term years of the CIP. <br />As the 2026 CIP project page outlines, each of the playgrounds at Solstice, Flintwood Terrace and Riverdale <br />Parks are considered 'due' for replacement. Staff conducted an analysis and comparisons of all three, and found <br />that Flintwood Terrace and Riverdale Park merit replacement more so than Solstice Park. Based upon a <br />significant number of playground patrons at Riverdale Park above Flintwood Terrace, at the January regular <br />meeting, the Commission directed staff to focus on Riverdale Park this year —with the development of a Request <br />for Proposals, which led to the March Commission case, where the preferred proposal(s) was selected, pending <br />learning the outcome of the MN DNR grant for additional funding. <br />Notification: <br />The Public Hearing on the 2026-2035 city-wide Capital Improvement Plan (CIP) conducted in December 2025, <br />included the 2026 playground replacement this case discusses <br />Time Frame/Observations/Alternatives: <br />The city was not successful in securing additional external funding for the 2026 playground replacement, and <br />finds that the earlier proposal selected by the Commission in the $125k configuration (with limited <br />Poured -in -Place surfacing and Engineered Wood Fiber elsewhere), is wholly adequate for the Riverdale Park <br />playground project. <br />The first attachment illustrates the play equipment components to be installed, and works within the established <br />CIP allocation, by virtue of city forces removing the existing play equipment and providing all preparatory work <br />and site restoration. (An approximately $20k - $30k value.). <br />Funding Source: <br />Pursuant to the Playground Replacement Policy, funding for playground refurbishment and replacements would <br />be from the Lawful Gambling Fund. <br />Recommendation: <br />