My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/13/2007
Ramsey
>
Public
>
Agendas
>
Council
>
2007
>
Agenda - Council - 03/13/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 10:01:21 AM
Creation date
3/12/2007 8:01:12 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/13/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Appendix C <br />Billing Rate Schedule <br /> <br />DSU/Bonestroo <br /> <br />Classification Hourlv Rates <br />Senior Principal. $117.00 - $150.00 <br />Principal 112.00 - 140.00 <br />Specialist * 103.00 - 215.00 <br />Proiect Manager . 108.00 - 135.00 <br />Senior Engineer / Scientist / Architect / Landscape <br />Architect I Planner 103.00 - 135.00 <br />Architect I Landscape Architect 94.00 - 114.00 <br />EnQineer I Planner 78.00 - 112.00 <br />Environmental Scientist 78.00 - 112.00 <br />Desianer I GIS I Landscape Desianer IGraohics 79.00 - 97.00 <br />Enoineering Technician 61.00 - 93.00 <br />Proiect Technician 42.00 - 63.00 <br />Field Supervisor 83.00 - 128.00 <br />Crew Chief 64.00 - 100.00 <br />Inspector 63.00. - 87.00 <br />Survey Technician 44.00 - 63.00 <br />GPS Survey Equipment 38.00 <br />Total Station Equipment 28.00 <br />GIS Workstation Eauioment 22.00 <br />GPS Submeter Unit (per use) 80.00 <br />Flow Meter (per week) 200.00 <br />Air Detection Equipment (per half day) 25.00 <br />* Specialist: Experts in highly technical disciplines including Registered Land <br />Surveyors, Principal Planners and Market Analysts. <br />These rates are adjusted annually at the first of the year in accordance with the <br />normal review procedures of Bonestroo, Rosene, Anderlik and Associates, Inc. <br /> <br />Project Team Hourly Rates <br /> <br />Phil Carlson:" Project Manager $128.00 <br />Brendon Slotterback - Planner 86.00 <br />Paul Bockenstedt - Natural Resources 108.00 <br />Gunnar Unger - Public Facilities 135.00 <br />Hongyi Duan - GIS 85.00 <br /> <br />Public Sector - no design or construction <br /> <br />-115- <br />C-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.