My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/13/2007
Ramsey
>
Public
>
Agendas
>
Council
>
2007
>
Agenda - Council - 03/13/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 10:01:21 AM
Creation date
3/12/2007 8:01:12 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/13/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.,.."f - <br /> <br />IY'/':- <br /> <br />,",.--::' . <br /> <br />City of Ramsey Municipal Center <br />CHANGE ORDER <br /> <br />City of Ramsey <br />7550 Sunwood Drive <br />Ramsey, MN <br /> <br />CHANGE ORDER NUMBER: <br />DATE: <br />CONTRACTOR DATE: <br />CONTRACTOR FOR: <br /> <br />PROJECT NUMBER: <br />PROJECT NAME: <br /> <br />060229 <br />Municipal Center\Construction\Contracts\1161 _ Elect Res <br /> <br />TO CONTRACTOR: <br /> <br />Electric Resource Contractors <br />4024 Washington Avenue North <br />Minneapolis, MN 55412 <br /> <br />The Contract is changed as follows: <br />ASI 11R - Floor box locations in room F110 per RIF 59. <br />ASI12 - Revision of location of police lobby door F194B perRFI 55 <br />ASI16 - Changes to slab in room F257. <br />AS/17 - F241 relocate soffits to enclose ducts. <br />- FCA 1 02 - Provide 220V, 20 amp power outlet.on east wall for owner's <br />copier <br />- FCA 128 - Extend 1 1" conduit from future clock tower pier to city <br />sidewalk at direction of construction manager. <br />FCA 152 - Backcharge from CD Tile arid Stone for crack suppression at . <br />floor lights. <br />- FCA 162 - Provide power and controls to window shade west of grid 4 <br />- FCA 163 - Provide 2 new floor pokes thru units with complete installation <br />in the cube conference spaces in S215, open office. <br />FCA 165 - Provide conduit and power for F160 for the AN projection <br />screen controller. <br />FCA 172 - Per RFI290 furhish and install necessary electrical items <br />noted including fire alarm connections and piping for temp control <br />sensors. <br />FCA 196 - Furnish and install electrical power for condensate transfer <br />pump near HRU-1 in F253, per RF/296. <br />FCA 198 - Provide power to Lav-3 inf F227 and F114, provide and install <br />electrical cords for 3 garbage disposals. <br />FCA 201 - Provide power supply to MUA-2 in Sally Port. Provide amp <br />circuit to chiller control panel instead of 120120 amp specified, <br />- PR 89 - Elevator Smoke Detectors <br />~ PR 92 - Add light to soffit for elevator <br />--. PR 93 - Open office. area and hallway lighting control <br />- PR 99 - Revision to fight fixture type HH, step light <br />RFI 286 - Add 120V circuits for ERU 1 & 2 controllers <br />TOTAL CHANGES: <br /> <br />ORIGINAL <br /> <br />1161-12 <br />25-Jan-2007 <br />01-Jun-2005 <br />RM-1161: Electrical <br /> <br />Not valid until signed by the general contractor and the owner. <br />Signature of the owner indicates agreement herewith, including any adjustment in the Contract Sum or the Contract Time. <br /> <br />The Original Contract Amount was <br />Net change by previously authorized Change Orders <br />The Current Contract Amount prior to this Change Order was <br />The Current Contract Amount will be increased by this Change Order in the amount of <br />The new Current Contract Amount including this Change Order will be <br />The Contract Time will be unchanged. <br />The date of Substantial Completion as of the date of this Change Order therefore is <br /> <br />-82- <br /> <br />$1.239,000.00 <br />$137,474.41 <br />$1,376,474.41 <br />$20,421.00 <br />$1,396,895.41 <br /> <br />30-Sep-200B <br />
The URL can be used to link to this page
Your browser does not support the video tag.