Laserfiche WebLink
PROJECT: The Waterfront- Ramsey, MN <br />/ <br />a <br />AIA DOCUMENT G703 <br />CONTINUATION SHEET <br />APPLICATION NUMBER; <br />APPLICATION DATE: <br />PERIOD TO: <br />ARCHITECT'S PROJECT NO: <br />RETATNAGE <br />2,032.00 <br />1,524.00 <br />23,730.25 <br />900.00 <br />2,857.50 <br />175.00 <br />$ 31,218.75 <br />_ <br />BALANCE <br />TO FINISH <br />(C w G) <br />e <br />_0 <br />/ <br />z * $ y w s <br />68888E <br />/ $ §)) § <br />°000L <br />0 <br />TOTAL <br />COMPLETED <br />AND STORED <br />TO DATE <br />(D+E+F) <br />40,640.00 <br />30,480.00 <br />474,605.00 <br />18,000.00 <br />57,150.00 <br />3,500.00 <br />$ 624,375.00 <br />_ <br />MATERIALS <br />PRESENTLY <br />STORED <br />(NOT IN <br />D OR E) <br />_ <br />D E <br />WORK COMPLETED <br />FROM PREVIOUS <br />APPLICATION THIS PERIOD <br />(D+E) <br />3,500.00 <br />§ <br />) <br />w <br />m <br />40,540.00 <br />30,480.00 <br />474,605.00 <br />18,000.00 <br />57,150.00 <br />$ 620,875.00 <br />/ § <br />2 / <br />0 > <br />« <br />$ 40,540.00 <br />$ 30,480.00 <br />$ 474,605.00 <br />$ 18,000.00 <br />$ 57,150.00 <br />$ 3,500.00 <br />$ 624,375.00 <br />MI <br />DESCRIPTION OF WORK <br />Mobilization <br />Manifold and Drainage Piping <br />Assemble, Set, and Plumb Features <br />Excavate, Pour Pad, and Set Manifold Pits <br />Splash Pad Electrical <br />Start Up and Owner Training <br />L_ TOTALS <br />§ k <br />