Laserfiche WebLink
appropriate during the PERMITTEE'S installation of the Stage 1 Improvements. The <br />license shall expire after the CITY accepts ownership of Stage 1 Improvements. <br />10. Stage II CITY Improvements. The public improvements the PERMITTEE must <br />construct or install are as follows: <br />a. Street lights per agreement with Connexus Energy <br />b. installation of survey monumentation. <br />(the "Stage 11 Improvements"). The PERMITTEE must complete the construction of the <br />Stage II Improvements within one (1) year after the date upon which the Plat is recorded, <br />subject to extension due to force majeure. <br />PERMITTEE must install the Stage 11 Improvements in accordance with the Plans. Per <br />City Code Section 117-615, the PERMITTEE shall provide the CITY with a set of re- <br />producible as -built plans in Computer Aided Drafting (CAD) format upon completion of <br />the Stage 11 Improvements and acceptance by the CITY. As as -built plans are a required <br />Stage II Improvement item per City Code Section 117-615, the CITY will not release the <br />required Stage 1 Improvement Financial Guaranty noted in paragraph #12 below until <br />CITY has received the as -built plans. Additionally, the PERMITTEE agrees to provide <br />to the CITY the plans in CAD format prior to the commencement of construction of the <br />Stage II improvements. <br />11. Required Private lmprovements. The private improvements the PERMITTEE will <br />construct or install are as follows (the "Required Private lmprovements"): <br />a. Sanitary sewer <br />b. Water <br />c. Storm drainage facilities <br />d. Stormwater maintenance <br />e. Parking lot <br />f. Concrete curb and gutter <br />g. Lot grading <br />h. Landscaping <br />12. Financial Guaranty for Stage 1 Improvements, Stage 11 Improvements, and Required <br />Private Improvements. The PERMITTEE shall provide a financial guaranty in customary <br />form to the CITY guaranteeing the construction of the Stage I Improvements, Stage II <br />Improvements, Required Private Improvements, and their timely completion (subject to <br />force majeure). The PERMITTEE shall be responsible for a financial guaranty in the <br />amount of ($2,022,750.00), which amount is 75% of the CITY Engineer's estimated cost <br />of the Stage I Improvements. Upon substantial completion of Stage I improvements <br />(including the removal of "temporary" erosion control measures as identified in the <br />approved Grading Plan), acceptance by the CITY, supported by appropriate lien waivers, <br />the financial guaranty shall automatically, without the need for any request by <br />PERMITTEE or action by the CITY, be reduced by the amount completed. <br />13. Inspection Fees for the Sta eg I lmprovements Stage II Improvements and Required <br />Private Improvements. The PERMITTEE shall provide an inspection fee to the CITY to <br />inspect the Stage 1 Improvements, Stage 11 Improvements, and Required Private <br />4 <br />