Laserfiche WebLink
EXISTING UTILITIES SHOvvN ARE SHOVI IN AN APPROXIMATE \,NV ONLY. THE CONTRACTOR SHALL DETERMINE THE EXACT <br />LOCATION OF ANY AND ALL EXISTING UTILITIES BEFORE COMMENCING WORK. HE AGREES TO BE FULLY RESPONSIBLE FOR ANY <br />AND ALL DAMAGES ARISING OUT OF HIS FAILURE TO EXACT, LOCATE AND PRESERVE ANY AND ALL EXISTING UTILITIES. <br />DRAWING NAME NO. BY DATE <br />Layout-Erkium <br />DRAWN BY <br />RSM <br />2 <br />3 <br />RSM <br />RSM <br />MJV <br />2-13-26 <br />3-30-26 <br />7-31-26 <br />REVISIONS <br />Added House Pads <br />City Comments - 03/27/26 <br />City Comments - 07/27/26 <br />CHECKED BY <br />RSM <br />DATE <br />02-01-26 <br />USE (INCLUDING COPYING, DISTRIBUTION, AND/OR CONVEYANCE OF <br />INFORMATION) OF THIS PRODUCT IS STRICTLY PROHIBITED WITHOUT <br />SATHRE-BERGQUIST, INC.'s EXPRESS WRITTEN AUTHORIZATION. USE WITHOUT <br />SAID AUTHORIZATION CONSTITUTES AN ILLEGITIMATE USE AND SHALL THEREBY <br />INDEMNIFY SATHRE-BERGQUIST, INC. OF ALL RESPONSIBILITY. <br />SATHRE-BERGQUIST, INC. RESERVES THE RIGHT TO HOLD ANY ILLEGITIMATE <br />USER OR PARTY LEGALLY RESPONSIBLE FOR DAMAGES OR LOSSES RESULTING <br />FROM ILLEGITMATE USE. <br />I HEREBY CERTIFY THAT THIS PLAN OR SPECIFICATION WAS <br />PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I <br />AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE <br />LAWS OF THE STATE OF MINNESOTA. <br />s. <br />ROBERT S. M LST , P.E. <br />Date: 07/ (3 Z/ <br />Lis. No. —,L —B <br />GENERAL NOTES: <br />1. INSTALL SILT FENCE AS SHOWN ON PLAN, AS REQUIRED BY THE CITY OF RAMSEY OR DIRECTED BY THE ENGINEER. <br />2. THE WATER QUALITY POND MUST BE EXCAVATED AT THE BEGINNING OF GRADING OPERATIONS TO PROVIDE TEMPORARY <br />STORM WATER DETENTION DURING CONSTRUCTION. SAND AND SILT MUST BE REMOVED FROM THE POND AS NECESSARY <br />DURING CONSTRUCTION AND AT THE COMPLETION OF THE PROJECT. <br />3. BEGIN GRADING, INSTALL PERFORATED RISER PIPE IN POND WHEN POND GRADING IS COMPLETE. TEMPORARY DRAINAGE <br />PIPE SHALL BE USED FOR INTERMEDIATE DRAINAGE DURING THE CONSTRUCTION PERIOD AS NECESSARY AND DIRECTED BY <br />THE ENGINEER. INSTALL SILT FENCE AROUND EXCAVATED PONDS. <br />4. INSPECT POND, SILT FENCE, AND ROCK ENTRANCE BERM AFTER ALL RAINFALL EVENTS AS REQUIRED BY THE NPDES PERMIT. <br />5. ALL PONDS SHALL BE LINED PER CITY REQUIREMENT & SEED SLOPES BETWEEN NWL AND 100 YR HWL WITH A WATER <br />TOLERANT MIX. (OR AS NOTED) <br />6. REMOVE PERFORATED RISER PIPE WHEN STORM SEWER AND OUTLET STRUCTURE FOR PONDS ARE INSTALLED. <br />7. POND - 10:1 BENCH (1 FOOT) THEN 4:1 MAX <br />8. LO & WO PADS 3:1 MAX. ALL OTHER SLOPES 4:1 MAX (UNLESS NOTED) <br />9. THE GRADING CONTRACTOR IS RESPONSIBLE FOR ALL STORM WATER INSPECTIONS ACCORDING TO THE MPCA STORM <br />WATER PERMIT. THIS INCLUDES BOTH WEEKLY INSPECTIONS AND INSPECTIONS DONE AFTER A 0.5" RAIN EVENT. A COPY OF <br />THE INSPECTION REPORT MUST BE EMAILED TO THE ENGINEER AND DEVELOPER ON A WEEKLY BASIS. <br />10. THE CONTRACTOR SHALL PLACE INLET PROTECTION DEVICES IN ACCORDANCE WITH THE CITY OF RAMSEY DETAILS FOR ALL <br />STORM SEWER INLETS AND MAINTAIN THEM AS AN EFFECTIVE SILT CONTROL DEVICE. INLET PROTECTION SHALL BE <br />REMOVED WHEN RESTORATION HAS BEEN ESTABLISHED. <br />11. ALL RETAINING WALLS WILL REQUIRE A STRUCTURAL DESIGN. A BUILDING PERMIT & A FINAL INSPECTION REPORT. <br />RETAINING WALLS WITH 4'+ OF DROP WILL REQUIRE FALL PROTECTION (EX. FENCE). <br />12. A 1"-2" CRUSHED ROCK ENTRANCE BERM SHALL BE PLACED AT THE SITE ENTRANCE, TO REPLACE SILT FENCE, AND MINIMIZE <br />EROSION ON TO THE STREETS. THE ROCK BERMS SHALL BE THE WIDTH OF THE ENTRANCE AND 2 FEET HIGH WITH 4:1 <br />SYMBOL LEGEND <br />DESCRIPTION <br />PROPOSED <br />EXISTING <br />MINARLDNIOUR <br />--------- <br />_SBA <br />MAJOR CONTOUR_ <br />LOT LINE <br />BUILDING SETBACK LINE <br />BSBL— <br />BSBL <br />GARAGE SETBACK LINE <br />GSBL <br />— GS. — <br />PARCEL BOUNDARY LINE <br />DRAINAGE AND UTILI, EASEMENTS <br />— — <br />— — <br />C URB <br />RICHTOF aER <br />AV <br />BACKYARD CATCH BASIN <br />—»-0—»— <br />—..— <br />CATOIBASIN <br />STORM SEWER MANHOLE <br />—., —6—v — <br />—.r-8—n— <br />FLARED END SECTION N,RIP-RAP <br />u. <br />_<11 <br />SANITARY SEWER MANHOLE <br />—.CD—.— <br />— $,— <br />FYDRANT <br />—I —W— 1 — <br />— I I — <br />GATE VALVE <br />I ---Erl— I — <br />— I ---tee— I — <br />DRAIN FLOW/RUNOFF ARROW <br />FMFRGENCY OVFRFI OW BWAI F <br />SILT FENCE -POST CONSTRUCTION) <br />-- — — <br />SPOT ELELATICN <br />,,BBO, <br />y9a0U <br />TBC SPOT ELEVATION <br />.050.00 <br />100 YEAR HAL <br />SLOPES. <br />13. THE CONTRACTOR SHALL MAINTAIN POSITIVE DRAINAGE AWAY FROM THE BUILDING PAD AND STREET AREAS THROUGHOUT <br />CONSTRUCTION. <br />14. THE CONTRACTOR SHALL ATTEMPT TO PREVENT SOIL MATERIALS FROM LEAVING THE SITE BY EROSION AND VEHICLE <br />WHEEL TRACKING. HE SHALL BE RESPONSIBLE FOR CLEANING OF STREET, BOULEVARD AND UTILITY FACILITIES THAT <br />RECEIVE ANY ERODED OR TRACKED SOIL MATERIAL OR OTHER CONSTRUCTION DEBRIS OR MATERIAL. <br />15. EXISTING UTILITIES SHOWN ARE SHOWN IN AN APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL DETERMINE THE EXACT <br />LOCATION OF ANY AND ALL EXISTING UTILITIES BEFORE COMMENCING WORK. HE AGREES TO BE FULLY RESPONSIBLE FOR <br />ANY AND ALL DAMAGES ARISING OUT OF HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL EXISTING UTILITIES. <br />16. BUILDING PADS ARE 100' WIDE & 75' DEEP , UNLESS OTHERWISE NOTED. THE FRONT AND REAR BUILDING PAD LINES ARE <br />SHOWN ON THE PLAN. THE ENGINEER SHOULD BE CONTACTED IF THE CONTRACTOR HAS ANY QUESTIONS REGARDING <br />BUILDING PADS. <br />17. LOTS 2-4, BLOCK 3 SHALL REQUIRE ELEVATION (GRADING AS -BUILT) CERTIFICATE PRIOR TO ISSUANCE OF A CERTIFICATE <br />OF OCCUPANCY TO ENSURE COMPLIANCE WITH FLOODPLAIN ELEVATION STANDARDS ONCE HOMES HAVE BEEN BUILT. <br />RESTORATION NOTES <br />RESTORATION - 9.62 ACRES <br />A. RESTORE ALL DISTURBED AREAS WITH 4" TO 6" OF TOPSOIL, OR EXISTING ON -SITE ORGANIC MATERIAL (NOT MORE THAN 35% <br />SAND). <br />B. SEED POND SLOPES AND DETENTION AREAS WITH MN/DOT WET DITCH (WD) SEED MIX AT A RATE OF 20 LBS./ACRE AND <br />FERTILIZE WITH 20-0-10 AT 100 LBS./ACRE. <br />C. SEED BASIN AREAS WITH MN/DOT WET DITCH (WD) SEED MIX AT A RATE OF 20 LBS./ACRE AND FERTILIZE WITH 20-0-10 AT 100 <br />LBS./ACRE. <br />D. SEED ALL OTHER DISTURBED AREAS WITH MNDOT MESIC INSLOPE (MI) SEED MIX AT A RATE OF 65 LBS./ACRE AND FERTILIZE <br />WITH 20-0-10 AT 100 LBS./ACRE. (UNLESS OTHERWISE NOTED) <br />E. ONLY PHOSPHOROUS FREE FERTILIZER IS TO BE USED ON SITE. <br />F. MULCH WITH TYPE 1 AT A RATE OF 2 TONS/ACRE AND DISC ANCHOR IMMEDIATELY AFTER PLACEMENT. USE WOODFIBER <br />BLANKET ON ALL SLOPES 3:1 (FT) OR GREATER. <br />G. PLACE APPROVED STORM SEWER INLET PROTECTION IN OR AROUND ALL STORM SEWER INLETS AND MAINTAIN UNTIL STREET <br />CONSTRUCTION IS COMPLETED. REFER TO CITY DETAILS FOR APPROVED DEVICES. <br />H. MAINTAIN ALL SILT FENCE UNTIL TURF HAS BEEN ESTABLISHED. <br />I. RESTORATION WORK WILL BE COMPLETED WITHIN 72 HOURS OF GRADING COMPLETION. <br />J. SILT FENCE, BEFORE GRADING - 11,480 LF <br />AFTER GRADING - 140 LF <br />K. WOODFIBER BLANKET - 4,848 SY <br />• <br />SATHRE-BERGQUIST, INC. <br />14000 25TH AVE N #120 PLYMOUTH, MN. 55447 (952) 476-6000 <br />ON -SITE BMPS <br />1. NURP POND - NURP POND WILL BE UTILIZED TO MEET OR EXCEED QUALITY AND RATE CONTROL REQUIREMENTS. <br />2. SKIMMERS - THE POND OUTLET STRUCTURE INCLUDES A SUBMERGED INLET PIPE TO ALLOW SKIMMING. <br />3. RIP RAP - RIP RAP WILL BE UTILIZED AT ALL APRONS FOR ENERGY DISSIPATION AND PROVIDE SEDIMENT CONTROL. <br />4. INLET PROTECTION - INLET PROTECTION WILL BE INSTALLED AND MAINTAINED IN ALL CATCH BASINS & REAR YARD <br />STRUCTURES. REFER TO THE CITY DETAILS TO DETERMINE WHICH INLET PROTECTION DEVICE IS APPLICABLE. <br />5. SLOPE STABILIZATION - SILT FENCE WILL BE INSTALLED ALONG DOWN GRADIENT GRADING LIMITS AND WOODFIBER <br />BLANKET WILL BE UTILIZED ON ALL SLOPES 3:1 OR GREATER TO PROVIDE ADEQUATE SLOPE STABILIZATION. <br />6. BIOROLLS - BIOROLLS WILL BE INSTALLED ALONG REAR YARD SWALES TO PREVENT SEDIMENT FROM REACHING THE <br />NURP POND AND ULTIMATELY DOWNSTREAM WETLANDS. <br />7. INFILTRATION/RETENTION AREAS - INFILTRATION/RETENTION AREAS WILL BE UTILIZED TO REDUCE/RETAIN THE RUNOFF <br />FROM THE INCREASED HARD SURFACE. <br />8. STREET SWEEPING - STREET SWEEPING WILL BE DONE A MINIMUM OF ONCE PER WEEK OR MORE FREQUENTLY TO <br />MINIMIZE DUST CONTROL AND VEHICLE TRACKING. TRACKED SEDIMENT MUST BE REMOVED FROM ALL PAVED SURFACES <br />WITHIN 3 HOURS AFTER NOTIFICATION BY THE CITY THAT SWEEPING IS REQUIRED. <br />10. PHOSPHOROUS FREE FERTILIZER - PHOSPHOROUS FREE FERTILIZER WILL ALSO BE USED ON SITE. <br />11. DITCH CHECKS SHALL BE INSTALLED EVERY 100' IN THE TEMPORARY DRAINAGE DITCHES AND AS SHOW IN THE EROSION <br />CONTROL PLANS. <br />CITY PROJECT NO. <br />RAMSEY, <br />MINNESOTA <br />‘;;; 100 50 <br />n n 7 n <br />0 50 100 200 <br />SCALE IN FEET <br />FILE NO. <br />19214-020 <br />GRADING PLAN <br />RUM RIVER RETREAT <br />.,UNDANCE WOODS, LLC <br />11 <br />30 <br />