My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/08/2026
Ramsey
>
Public
>
Agendas
>
Council
>
2026
>
Agenda - Council - 09/08/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2026 12:31:23 PM
Creation date
9/8/2026 11:19:22 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/08/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br />a <br />a <br />3 <br />rn <br />(70 <br />0 <br />0 <br />z <br />a <br />a <br />z <br />z <br />C, <br />z <br />ao <br />o <br />00 <br />N N <br />a/ <br />W <br />rna <br />SWPPP NARRATIVE: <br />1. IF THE CONTRACTOR DISTURBS MORE THAN 1 ACRE OF LAND, THE CONTRACTOR AND OWNER MUST APPLY FOR <br />PERMIT COVERAGE UNDER THE GENERAL STORMWATER PERMIT FOR CONSTRUCTION ACTIVITY AS REQUIRED BY THE <br />NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PHASE II PROGRAM ISSUED AUGUST 1, 2023. <br />COVERAGE WILL BEGIN 7 DAYS AFTER ONLINE SUBMISSION OF THE PERMIT APPLICATION. <br />2. THIS SWPPP INCLUDES BOTH PERMANENT AND TEMPORARY BEST MANAGEMENT PRACTICES (BMPs). THE LOCATION <br />AND TYPE OF BMPs ARE DEPICTED ON THE GRADING, DRAINAGE AND EROSION CONTROL PLAN. CONSTRUCT ALL <br />BMPs IN ACCORDANCE WITH THE APPLICABLE DETAILS IN THESE PLANS. <br />3. DISCHARGE OF ANY MATERIAL OTHER THAN STORMWATER OR DISCHARGES ASSOCIATED WITH DEWATERING FROM THE <br />SITE ARE PROHIBITED. <br />4. THIS SWPPP IS NOT DESIGNED FOR DISCHARGES ASSOCIATED WITH INDUSTRIAL ACTIVITY. PERMITTEES MUST OBTAIN <br />COVERAGE FOR DISCHARGES ASSOCIATED WITH INDUSTRIAL ACTIVITIES UNDER A SEPARATE NPDES PERMIT AFTER <br />DAY TO DAY OPERATION ACTIVITIES COMMENCE EVEN IF CONSTRUCTION IS ONGOING. <br />5. IF A GENERAL STORMWATER PERMIT FOR CONSTRUCTION IS REQUIRED THE PERMITTEES MUST SUBMIT A <br />NOTIFICATION OF TERMINATION WITHIN 30 DAYS OF TERMINATION OF PROJECT. THE CITY OF BECKER MUST <br />APPROVE THE NOTICE OF TERMINATION BEFORE IT IS SUBMITTED TO THE MPCA. <br />PROJECT CONTACTS: <br />DESCRIPTION <br />COMPANY <br />CONTACT PERSON <br />PHONE <br />OWNER <br />SCOOTER'S COFFEE <br />BRIGIT MARSHALL <br />763-300-5849 <br />CONTRACTOR <br />TBD <br />TBD <br />TBD <br />SWPPP DESIGNER <br />HAKANSON ANDERSON <br />SAM JOCHUM <br />763-427-5860 <br />ANTICIPATED CONSTRUCTION SEQUENCE: <br />1. PERIMETER SEDIMENT CONTROL SHALL BE INSTALLED PRIOR TO ANY EARTH DISTURBING ACTIVITIES. <br />2. CONSTRUCT STABILIZED CONSTRUCTION ENTRANCE. <br />3. CONSTRUCT GRADING, UTILITIES, BUILDING AND PARKING AREA. <br />4. STABILIZE ALL DISTURBED AREAS. <br />PROJECT INFORMATION: <br />ONSITE DISTURBED AREA (ACRES) <br />0.95 <br />EXISTING IMPERVIOUS SURFACE (ACRES) <br />0.00 <br />PROPOSED IMPERVIOUS SURFACE (ACRES) <br />0.56 <br />PLANNED CONSTRUCTION START DATE <br />9/15/2026 <br />ESTIMATED CONSTRUCTION COMPLETION DATE <br />7/1/2027 <br />COUNTY <br />ANOKA <br />LATITUDE <br />45.2315 <br />LONGITUDE <br />-93.4505 <br />TEMPORARY SEDIMENT BASINS: <br />1. TEMPORARY SEDIMENT BASINS ARE REQUIRED WHERE 10 OR MORE ACRES DRAIN TO A COMMON LOCATION. <br />TEMPORARY SEDIMENT BASINS MUST HAVE A LIVE STORAGE FOR A 2 YEAR, 24 HOUR STORM EVENT OR 1800 CUBIC <br />FEET PER ACRE DRAINED. <br />MORE THAN 10 ACRES OF DISTURBED AREA <br />DRAINING TO COMMON LOCATION <br />NO <br />TEMPORARY SEDIMENT BASIN REQUIRED <br />NO <br />VOLUME REQ'D BASED ON 2-YEAR STORM OR <br />1800 CF / ACRE <br />NOT APPLICABLE <br />TIMING OF EROSION CONTROL: <br />1. THE CONTRACTOR MUST STABILIZE ALL EXPOSED SOIL IMMEDIATELY TO LIMIT SOIL EROSION WHEN CONSTRUCTION <br />ACTIVITY HAS PERMANENTLY OR TEMPORARILY CEASED AND WILL NOT RESUME FOR A PERIOD EXCEEDING SEVEN <br />CALENDAR DAYS. <br />2. ADJACENT TO SURFACE WATERS, STABILIZE THE NORMAL WETTED PERIMETER OF THE LAST 200 LINEAL FEET OF <br />PERMANENT OR TEMPORARY DRAINAGE DITCHES OR SWALES WITHIN 24 HOURS. <br />DATE <br />REVISION <br />I hereby certify that this plan, specification, or report was <br />prepared by me or under my direct supervision and that I <br />am a duly Licensed Professional Engineer under the laws <br />of the State of Minnesota. <br />DESIGNED BY: <br />SGJ <br />DRAWN BY: <br />IDM <br />SAMUEL G. JOCHUM, P.E. <br />Date 8/6/26 Lic. No 61933 <br />CIEf1E0 Br: <br />CJJ <br />171 <br />Hakanson Anderson <br />Civil Engineers and Land Surveyors <br />3601 Thurston Ave., Anoka, Minnesota 55303 <br />763-427-5860 FAX 763-427-0520 <br />www.hakanson—anderson.com <br />SURFACE WATERS MAP <br />SCOOTER'S COFFEE <br />SWPPP <br />CITY OF RAMSEY, MINNESOTA <br />5261.01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.