Laserfiche WebLink
Mayor Heineman summarized the direction to bring the matter back to Council after members <br />had additional time to consider the information. Staff would continue monitoring public input, <br />and no change to the City's current ALPR use was directed at that time. <br />Mayor Heineman recessed the Work Session at 6:57 p.m. for the regular City Council meeting. <br />Mayor Heineman reconvened the Work Session at 8:24 p.m. <br />2.02: Data Center Discussion <br />Community Development Director Hanson introduced the data -center discussion. She explained <br />that staff brought the matter forward because large data centers had received increased attention <br />and concern regarding electricity and water consumption, noise, and proximity to residential <br />neighborhoods and schools. She referenced a recent proposal considered by the City of Elk <br />River, where the City Council ultimately denied a data -center request and imposed a one-year <br />moratorium while conducting additional research. <br />Community Development Director Hanson explained that Ramsey currently allows data centers <br />as permitted uses within the I-1 and 1-2 zoning districts. Because they are permitted uses, the <br />City presently has no data -center -specific performance standards or ability to impose conditions <br />through a conditional use permit. Although vacant industrial land in Ramsey was limited, enough <br />property remained for a data center to locate within the City potentially. <br />Community Development Director Hanson identified three basic options for Council <br />consideration: amend the City Code to make data centers conditional uses and establish specific <br />design and performance standards; prohibit data centers within the applicable zoning districts; or <br />leave the existing ordinance unchanged. She noted that making data centers conditional uses with <br />specific standards appeared to be the most common approach among metropolitan -area <br />communities she had reviewed. Developing appropriate standards would likely require <br />approximately four to six months of research, consultation with other communities, and work <br />with the City Attorney. Potential standards could address building size, water and energy <br />consumption, and setbacks from residential properties, schools, parks, and other sensitive uses. <br />She noted that the Minnesota Pollution Control Agency regulates noise and indicated the City <br />could not establish standards more restrictive than applicable state requirements. <br />Mayor Heineman asked about the applicable MPCA noise limits and expressed concern about <br />how a continuous sound at the allowable level might affect an adjacent neighborhood. He noted <br />that both the volume and the location at which the sound was measured were important <br />considerations. <br />Staff clarified that the applicable noise measurement was taken at the property line. <br />City Council Work Session / September 8, 2026 <br />Page 6 of 8 <br />