Laserfiche WebLink
13. As -Built Record Plan. Per City Code Section 117-615(17), upon completion of the installation of <br />the Required Improvements, the PERMITTEE shall provide the CITY with copies of plans and <br />specifications showing the Required Improvements as finally constructed and installed, in both <br />digital (CAD) and paper form (PDF), as required by the CITY. Such as -built plans shall be certified <br />as true and accurate by the registered engineer responsible for the installation of the Required <br />Improvements. <br />14. "Acceptance" means written acceptance of the Required Improvements by the CITY after the <br />CITY determines that: (a) the Required Improvements have been completed in accordance with the <br />approved Plans, specifications, this Agreement, and applicable City standards; (b) all required <br />inspections, testing, and sewer televising have been completed and accepted; (c) all punch -list items <br />have been corrected; and (d) complete as -built plans and all other required closeout documents <br />have been submitted and accepted. <br />15. Survey Monumentation. The PERMITTEE must protect all lot corner stakes and survey <br />monumentation at all lot corners. <br />16. Preconstruction Meeting. The PERMITTEE shall schedule and hold a pre -construction meeting <br />with the City Engineer prior to commencing site work. <br />17. Boulevard and Area Restoration. The PERMITTEE shall be responsible for restoring all areas <br />disturbed by the development grading operation in accordance with the approved erosion and <br />sediment control plan. The PERMITTEE shall also be responsible for the cost of cleaning any <br />soil, earth or debris from the wetlands within and adjacent to the Subject Property resulting from <br />grading performed in the development of the land. <br />18. Construction Site Maintenance. The PERMITTEE shall adhere to all CITY ordinances relating <br />to, but not limited to, dumping of garbage, site development, construction debris, open burning, <br />etc. <br />19. Construction, Hours and Entrance Signs. The CITY restricts construction and delivery hours <br />to Monday through Saturday 7:00 a.m. to 10:00 p.m. The PERMITTEE is required to provide a <br />sign at each entrance point stating delivery and construction operation hours. Said signs are not to <br />exceed eighty (80) square feet in size and must be clearly visible at all times during the construction <br />period. <br />20. Estimated Cost. It is understood and agreed that cost amounts set forth in this Agreement as <br />Required Improvements, unless specified as fixed amounts, are estimated. The PERMITTEE <br />agrees to pay the entire cost of said improvements including interest, engineering and legal charges. <br />21. Site Plan Approval Expenses. The PERMITTEE agrees that it will pay to the CITY all CITY <br />expenses incurred in the approval of the Site Plan, including, but not limited to administration <br />expenses, engineering and legal fees. Said expenses shall be paid within fifteen (15) days of billing <br />by the CITY and outstanding billings shall be paid prior to issuance of the building permit. Any <br />expenses incurred after the release of the building permit shall also be paid within said fifteen (15) <br />day billing period. Failure to pay the CITY's expenses within the fifteen (15) day billing period <br />will permit the CITY to draw upon any of the financial guarantees or escrows required by this <br />contract for payment. <br />Wildlife Research/LH Road LLC <br />Development Agreement <br />Page 5 of 8 <br />