Laserfiche WebLink
Subdivision regulations may provide for a procedure for varying the regulations as they <br />apply to specific properties where an unusual hardship on the land exists, but variances <br />may be granted only upon the specific grounds set forth in the regulations. <br />Minn. Stat. § 462.358, subd. 6. Based on the bold language in subdivision 6, a city may grant a <br />variance from a requirement of its subdivision ordinance but only on the specific grounds stated <br />in the subdivision ordinance. <br />Review of the City's Subdivision Ordinance shows that it allows for variances to be granted in <br />three different circumstances, none of which applies here. <br />1. Section 117-048 provides for the possibility of a variance from strict conformity with "this <br />subdivision." The subdivision in which Sec. 117-048 is found is the Stormwater Pollution <br />Control subdivision, set forth in Secs. 117-383 through Sec. 117-410. The maximum cul- <br />de-sac length restriction is not found in the Stormwater Pollution Control subdivision. <br />2. Section 117-426(d) provides that "[v]ariances from the strict enforcement of this chapter <br />may be granted in accordance with the procedures and requirements of section 117-51." <br />Section 117-51 does not appear to exist. It was either previously repealed or never <br />enacted in the first place. <br />3. Finally, Section 117-561 provides for procedural variances. Specifically, that section <br />provides that "[t]he board of adjustment may adopt a resolution to grant a variance from <br />procedural requirements of this chapter[.]" A variance from the maximum cul-de-sac <br />length would be a variance from a substantive requirement of the Subdivision <br />Ordinance, not a procedural requirement. <br />Because the legislature has not authorized the City to grant variances from its Subdivision <br />Ordinance beyond those specifically identified in the Subdivision Ordinance, and because the <br />City's Subdivision Ordinance does not authorize variances from substantive requirements such <br />as the maximum length of a cul-de-sac, the City does not have the legal authority to grant the <br />requested variance. See Costley v. Caromin House, Inc., 313 N.W.2d 21, 27 (Minn. 1981) ("In <br />Minnesota, ... a municipality has no inherent power to enact zoning regulations [and...] cannot <br />exceed the limitations imposed by the enabling legislation.") <br />The cul-de-sac variance must be denied for lack of statutory authority, but it should be noted <br />that even if statutory authority existed it would still have to be denied for the lack of a showing of <br />any "unusual hardship." The length of the cul-de-sac is the result of design choices made by <br />the Applicant to maximize the number of homes and therefore the revenue that can be <br />generated from this project. It is therefore the product of choice, not any unusual hardship. <br />This would require denial of the variance even if it had a proper statutory basis. <br />Moreover, the justification for the variance provided in the staff report —that the non -compliant <br />cul-de-sac will just be temporary —is lacking any support in record. The contemplated future <br />connection to the west would require an extension across property owned by the Olsons, which <br />is not part of this application and is not controlled by the Applicant. The Applicant has identified <br />no existing easement, right-of-way, development agreement, construction deadline, or other <br />legally enforceable mechanism requiring that connection. Finally, the Olsons have no intention <br />of selling their land, at any price. The City must therefore evaluate the road as what the present <br />application actually creates: an indefinite 1,100-foot dead-end street, nearly twice the maximum <br />length allowed by ordinance. <br />