Project Name Department Project # Priority Project Cost
<br />Sorteberg's 4th & 5th Street Reconstruction Street Improvements 26-STR-014 3 692,803
<br />2035 Investigator Replace 2027 Investigatortor Capital Equipment POL-407 3 76,000
<br />2035 Patrol Squad Replace 2031 Patrol Squad Capital Equipment POL-418 3 92,000
<br />2035 Patrol Vehicle Replace 2031 Patrol Capital Equipment POL-428 3 92,000
<br />2035 Patrol Vehicle Replace 2031 Patrol Vehicle Capital Equipment POL-429 3 92,000
<br />2035 Patrol Vehicle Replace 2031 Patrol Squad Capital Equipment POL-430 3 92,000
<br />Replacement truck for Unit 622 -2022 Western Star Capital Equipment PW-724 3 350,000
<br />Replace #631 2024 Bobcat T-66 Skid Steer Capital Equipment PW-768 3 81,000
<br />Replace #636 2024 F-350 Pickup Capital Equipment PW-769 3 85,000
<br />Replace #640 2024 F-350 Truck w/Topper (Parks) Capital Equipment PW-770 3 85,000
<br />Replace #646 2024 F-350 Cre-Cab Truck (Parks) Capital Equipment PW-771 3 85,000
<br />Replace #648 2024 F-550 (Streets) Capital Equipment PW-772 3 116,000
<br />Replace #651 2025 Brush Bandit Intimidator 19XPC Capital Equipment PW-773 3 85,000
<br />Replace #652 2024 F-550 (Parks) Capital Equipment PW-774 3 116,000
<br />Replace #664 2007 Chev 2500 Truck (Mechanics) Capital Equipment PW-775 3 85,000
<br />Replace #675 2025 Kubota RTV (Parks) Capital Equipment PW-776 3 32,000
<br />Replace #679 2025 Exmark Zero -Turn Mower
<br />Capital Equipment PW-777 3 20,000
<br />(Streets)
<br />Replace #685 2025 Elgin Street Sweeper Capital Equipment PW-778 3 330,000
<br />Replace #626 2014 Tenant Floor Sweeper/Scrubber Capital Equipment PW-779 3 100,000
<br />Total for: Priority 3 5,834,935
<br />Total for 2035 6,059,935
<br />2036
<br />Priority 1-Existing Obligation (High)
<br />Annual MSA Pavement Marking Improvements
<br />Street Improvements
<br />22-STR-001 1
<br />Total for: Priority 1
<br />52,000
<br />52,000
<br />Priority 3-Existing Obligation (Med)
<br />Core Switch Replacement 2035 Capital Equipment 27-IT-001 3 70,000
<br />2036 MSA Overlays Street Improvements 27-STR-006 3 1,137,780
<br />Reconstruction Streets: Peltzer Street Improvements 27-STR-007 3 645,530
<br />Reconstruction Streets: Flintwood Hills Street Improvements 27-STR-008 3 1,168,256
<br />Reconstruction Streets: Ramsey Terrace Street Improvements 27-STR-009 3 972,279
<br />2036 Neighborhood Overlays Street Improvements 27-STR-010 3 1,124,550
<br />Replace 2029 Fire Prevention Vehicle Capital Equipment FIRE-591 3 60,000
<br />2036 Patrol Squad Replace 2032 Patrol Squad Capital Equipment POL-437 3 95,000
<br />2036 Patrol Squad Replace 2032 Patrol Squad Capital Equipment POL-438 3 95,000
<br />2036 Patrol Squad Replace 2032 Patrol Squad Capital Equipment POL-439 3 95,000
<br />2036 Patrol Squad Replace 2032 Patrol Squad Capital Equipment POL-440 3 95,000
<br />Replace #706 with 2036 Ford F350 Crew Cab Capital Equipment PW-781 3 185,700
<br />Replace #700 2026 Ford F250 Pickup with Plow Capital Equipment PW-782 3 138,500
<br />Replace #704 2026 Ford F550 Capital Equipment PW-783 3 179,200
<br />Total for: Priority 3 6,061,795
<br />Total for 2036 6,113,795
<br />GRAND TOTAL 93,194,327
<br />21
<br />Produced Using Plan -It CIP Software