5. 17. <br />CC Regular Session <br />Meeting Date: <br />10/27/2026 <br />Primary Strategic Plan Initiative: Improve the safety and mobility of transportation corridors. <br />Title: <br />Adopt Resolution #26-247 Approving Change Order #1 for 2026 MSA Pavement Overlay Improvements, Improvement <br />Project #26-02 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #26-247 approving Change Order #1 for 2026 MSA Pavement Overlay <br />Improvements, Improvement Project #26-02. <br />Background: <br />The existing culvert for County Ditch No. 51 was a metal culvert with noted deterioration at the ends. As part of this project, <br />the culvert has been replaced to the same elevation and diameter, but with reinforced concrete pipe. Concrete end caps and <br />sheet piling were used to avoid any settlement of the new culvert. The culvert installation also required dewatering, as this <br />culvert is half submerged in water. <br />173rd Avenue between Puma Street and Iguana Street crosses wetland and County Ditch No. 51. The geotechnical report for <br />this area found the pavement section was placed directly over peat, which is considered very poor soil for pavement support. <br />To address this geogrid was placed after reclamation, and the new pavement section was built up, generally raising the <br />profile of the road 1 to 2 feet. <br />Because 173rd Avenue and 175th Avenue are Municipal State Aid (MSA) street segments, and MSA funding is being used, <br />the project must adhere to MnDOT design standards, including using safety aprons on the new culvert, instead of traditional <br />flared end sections. The barrel section of the safety aprons are approximately 4 feet shorter than a traditional flared end <br />section. This was not factored in during the project design, which resulted in the match -in point for grading the ditch being <br />too close to the roadway, and causing an approximately 2.5:1 side slope, rather than the 4:1 which is called out for. <br />The steeper than allowable side slope was not noted until after culvert installation and bacllling of the aggregate base <br />began. Staff directed the contractor to bring an additional length of pipe out to extend the safety apron away from the road <br />and create an acceptable side slope. This required additional dewatering and installation of another concrete end cap with <br />sheet piling. Additionally, the contractor has requested an extension of the substantial completion from October 16 to <br />October 30, 2026 due to the time lost. The October l 6th date was set due to potentially unfavorably weather in late October. <br />However, the weather forecast is favorable, and the contractor has scheduled the remaining mill and paving to occur before <br />October 30th. <br />Notification: <br />If City Council approves this change order, staff will notify the MnDOT State Aid Office as required by MSA regulations. <br />Time Frame/Observations/Alternatives: <br />Observations: <br />Ideally staff would have noted the barrel length of the different style of apron, and consequently the different grading tie-in <br />point prior to installation. Staff will strive to avoid change orders of this nature in the future by allowing for more grading <br />tolerance during design and when required to use safety aprons instead of standard aprons. <br />Staff reviewed the unit prices for the change order and feels the prices are reasonable based on current construction costs. <br />The extension of substantial completion to October 30, 2026 is reasonable due to time lost to order additional materials, re- <br />mobilize equipment, and construct the changes. With the remaining work on the schedule, staff is confident the contractor <br />will complete the improvements by the new substantial completion date. <br />Alternatives: <br />Motion to adopt Resolution #26-247 approving Change Order #1 for 2026 MSA Pavement Overlay Improvements, <br />Improvement Project #26-02. <br />