My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/27/2026
Ramsey
>
Public
>
Agendas
>
Council
>
2026
>
Agenda - Council - 10/27/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2026 2:28:22 PM
Creation date
10/27/2026 1:54:21 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/27/2026
Supplemental fields
Year
%(Da
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
m- STATE AID FOR LOCAL TRANSPORTATION Rev. December2024 <br />CHANGE ORDER <br />LgA"SORTALION <br />SP/SAP(s) <br />SAP 199-101-013; <br />199-128-001 <br />MN Project No.: <br />Change Order No. <br />Project Location 173rd & 175th Avenue between CSAH 83 and CSAH 5 <br />Local Agency City of Ramsey Local Project No.' 26-02 <br />Contractor North Valley, Inc. Contract No. <br />Address/City/State/Zip 120015 Iguana St. NW Suite 100, Nowthen, MN 55330 <br />Total Change Order Amount $ 17,955.00 <br />1 <br />Issue: The Engineer has determined the Contract needs to be revised in accordance with specification 1806.3 - <br />Revise working days. The Contractor was installing the culvert with concrete end caps at station 52+64. The <br />engineer determined additional pipe length was required to meet side slopes off the roadway. This required <br />additional time for the culvert construction and additional grading. <br />Resolution: <br />1. The Agency will adjust the Phase 1 substantial completion time from Friday, October 16, 2026 to Friday, <br />October 30, 2026. <br />2. The Contractor will complete all Phase 1 work as outlined in the project specifications by Friday, October 30, <br />2026. <br />Entitlement: Payment for this work will be at: Contract Unit Prices, Negotiated Lump Sum, Negotiated Unit Prices, <br />or on a Force Account basis as provided in MnDOT Specification 1904 (include as many as apply), as shown in the <br />estimate of cost. <br />The Contract time will be modified as follows: Extension of the Phase 1 substantial completion time from Friday, <br />October 16, 2026 to Friday, October 30, 2026. <br />Estimate Of Cost: (Include any increases or decreases in contract items, any negotiated or force account items.) <br />Group/ <br />funding <br />Category <br />Item No. <br />Description <br />2106.601 Dewatering <br />2411.502 Construct Concrete End Cap <br />2452.601 Sheet Piling <br />2503.503 36" RC Pipe Sewer Design 3006 Class III <br />**Group/funding category is required for federal aid projects <br />Project Engineer: <br />Print Name: <br />�.es.antetz <br />+ or - <br />Unit Unit Price Quantity <br />LS <br />EA <br />LS <br />LF <br />$8,000.00 <br />$2,500.00 <br />$3,675.00 1 <br />$420.00 9 <br />1 <br />1 <br />Net Change this Change Order I <br />Date: <br />Phone: <br />+ or - <br />Amount $ <br />$8,000.00 <br />$2,500.00 <br />$3,675.00 <br />$3,780.00 <br />$17,955.00 <br />PfictiZozG <br />- 3-.`133-q 93 <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.