Laserfiche WebLink
7. 1. <br />CC Regular Session <br />Meeting Date: <br />10/27/2026 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />Title: <br />Adopt Resolution #26-229 Accepting Proposals and Awarding Contract for Municipal Wells #9 and #10 Well Siting <br />As sessment <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #26-229 accepting proposals and awarding a contract for a Well Siting Study <br />for proposed municipal Wells #9 and #10. <br />Background: <br />The City of Ramsey's existing municipal wellfields are comprised of 8 wells. Wells 1 and 2 are located in the southeast area <br />of the city, while Wells 3 through 8 are located in the southcentral portion of the city. All 8 wells draw water from the <br />Tunnel City-Wonewoc aquifer and range in depth between 316 and 390-feet. <br />Attached is a copy of the 2021 Feasibility Study prepared by SEH, Inc. while planning for the Centralized Water Treatment <br />Plant that contains detailed information on the city's existing water supply system and groundwater aquifers. Figure 1 (page <br />54) shows the city's existing water supply system, including the 8 well locations. Figures 6 (page 84) and 8 (page 86) show <br />the thicknesses of the Tunnel City and the Wonewoc aquifers, respectively, which is critical information needed to properly <br />site new wells. <br />The following italicized text copied from pages 24 and 25 of the feasibility study confirms that the city's source water <br />aquifer is anticipated to continue to produce sufficient quantities of potable water to meet the city's present and foreseeable <br />future demands, and that the city should plan additional well sites so as to ensure static water levels will remain sufficiently <br />above top of aquifers to meet MnDNR thresholds. <br />At present, there is no reason to assume that the current source water aquifer for the City of <br />Ramsey will not be able to supply potable water for the foreseeable future. The City of Ramsey's <br />source water aquifer and wells are able to meet present day demand and appear to have a <br />noticeable but temporary radius of influence on the surrounding aquifer. The wells are able to <br />support high pumping rates with specific capacity showing acceptable drawdown alongside the <br />aquifer ability to recharge to static levels within a clay of pumping. <br />The City of Ramsey will need to balance water demand with drawdown to meet Minnesota <br />Department of Natural Resources drawdown thresholds described in MN Rule 6115.0630 <br />Definitions Subps.15 and 16. Two thresholds are in place and regulate that wells must not <br />drawdown MnDNR assigned static water levels to within 50-percent and 25 percent to the top of <br />aquifer: These threshold values are set by a MnDNR observation well and would typically be <br />enforced if long term issues are observed. Thresholds for the City of Ramsey could become a <br />concern if there is extended pumping within a single well or pumping by multiple wells in close <br />proximity. <br />In summary, it is SEH's opinion that there is a 95% to 99% certainty that the source water <br />aquifer for the City of Ramsey will continue to produce potable water to meet present and <br />foreseeable future demands; however, the City of Ramsey should plan additional well <br />sites to ensure static water levels remain sufficiently above top of aquifers to meet MnDNR <br />thresholds. <br />Single well pumping for the City of Ramsey, as depicted by Well 5 in May, 2019 saw <br />approximately 90 to 100 feet of temporary drawdown. This observed drawdown nears the <br />MnDNR 50-percent threshold; however, the pumping extended multiple days and recharged <br />within the same time period back to static levels. This supports the ability of the wells to supply <br />continued water and ability to stay within prescribed State Statute. <br />