Laserfiche WebLink
Alternative #1: Motion to adopt Resolution #26-229 accepting proposals and awarding a contract for a Well Siting Study for <br />proposed municipal Wells #9 and #10. <br />Alternative #2: Motion of other. <br />Funding Source: <br />Copies of the associated 2026 — 2035 Capital Improvement Plan sheets, sheets 295 and 296, are attached for reference. As <br />noted, the CIP level cost estimate for the study is $50,000. <br />SEH's project fees identified within their proposal total $72,344, which is the lowest fee of all four proposals. This includes <br />SEH's fees for phase 1($32,619) and phase 2 ($39,725). <br />SEH's proposal also identifies estimated construction costs for four test holes/wells of up to $709,675. These costs are <br />proposed to be paid by the city, who will contract directly with the well driller. The actual number of test holes/wells that <br />will need to be drilled will depend on the geology and the well siting assessment findings. Production well costs can be <br />reduced significantly if the production well can be drilled in the same location as the test well. Test well costs are included in <br />the CIP costs, as are costs to construct the production wells and well houses, though these costs can vary greatly depending <br />on the location of the production wells. <br />All costs for the assessment and the test holes/wells will be paid for from the water enterprise funds. <br />Recommendation: <br />Staff recommends alternative #1 to ensure an adequate supply of water can be maintained for municipal water supply system <br />users. <br />Outcome/Action: <br />Motion to adopt Resolution #26-229 accepting proposals and awarding a contract for a Well Siting Study for proposed <br />municipal Wells #9 and #10. <br />Attachments <br />Resolution 26-229 <br />2021 Feasibility Study <br />2026-35 CIP sheet 297 <br />Adopted Res 26-134 <br />Request for Proposals <br />SEH Proposal <br />Anoka Co Atlas Plate 3 <br />Anoka Co Atlas Plate 4 <br />Met Council Report <br />Met Council Report Summary <br />2026-35 CIP Sheets 295-296 <br />Form Review <br />Inbox Reviewed By Date <br />Brian Hagen Brian Hagen 10/22/2026 02:26 PM <br />Form Started By: Bruce Westby Started On: 08/26/2026 12:34 PM <br />Final Approval Date: 10/22/2026 <br />