My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/27/2026
Ramsey
>
Public
>
Agendas
>
Council
>
2026
>
Agenda - Council - 10/27/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2026 2:28:22 PM
Creation date
10/27/2026 1:54:21 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/27/2026
Supplemental fields
Year
%(Da
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Firm Project Experience, Client References <br />Our firm's experience completing similar work is outlined in detail below for three related projects, and includes a client <br />reference for each project. Additional recent, related work is outlined in this section, and shows our specific experience <br />completing well head and well site investigations in both Minnesota and Wisconsin. <br />Water Treatment Plant Feasibility <br />Study and Source Water Analysis <br />RAMSEY, MN <br />SEH completed the feasibility study for the City's 10 MGD water treatment plant. The <br />study included a full source water analysis of the Tunnel City-Wonewoc aquifer. The <br />following tasks were completed as part of this study: <br />o Mapped the thickness and extent of the Tunnel City Group and Wonewoc Sandstone <br />across the City <br />o Calculated specific capacity, transmissivity, and radius of influence from City <br />well records <br />o Built a Metro Model 3 submodel of the wellfield and modeled present-day and <br />2040 drawdown <br />o Compared observed drawdown in Well 3 to the model results to check calibration <br />o Identified three potential well siting areas for future wells <br />This model was <br />completed by the same <br />team members proposed <br />for your Well Siting <br />Study, which will quicken <br />ramp -up time and create <br />efficiencies for the model <br />review period for your <br />Well Siting project. <br />Project Details <br />CLIENT <br />City of Ramsey <br />YEAR COMPLETED <br />2019-2021 <br />REFERENCE <br />Bruce Westby <br />Public Works Director <br />763.433.9863 <br />KEY PERSONNEL <br />Mark Sherrill <br />Melanie Niday <br />Chris Larson <br />SHORT ELLIOTT HENDRICKSON INC. <br />WELL SITING ASSESSMENT FOR MUNICIPAL WELLS #9 AND #10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.