My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/27/2026
Ramsey
>
Public
>
Agendas
>
Council
>
2026
>
Agenda - Council - 10/27/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2026 2:28:22 PM
Creation date
10/27/2026 1:54:21 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/27/2026
Supplemental fields
Year
%(Da
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Well Siting and Aquifer <br />Interference Analysis <br />ROSEMOUNT, MN <br />Dleplacement(ft) <br />1w. <br />W. <br />80. <br />70. <br />80. <br />50. <br />40. <br />30. <br />20. <br />10. <br />0. <br />0.001 <br />1 me Loslance YKK ror INVS a[ t'em3lea L apecrry for JO days <br />0.01 <br />0.1 <br />10. <br />Time (day) <br />100. <br />1.0E+4 <br />Obs. Wells <br />Aquifer Model <br />Leaky <br />Solution <br />HantushJacob <br />Parameters <br />T = 4550. 112/da <br />S = 0.0003 <br />133 = 0.00058821 <br />KZ/Kr = 1. <br />b =80_ft <br />This analysis included a time-drawdown projection at six observation wells (left), <br />and projected drawdown contours and nearby domestic wells (right), completed in <br />AQTESOLV software. <br />SEH evaluated a new supply well site for the City of Rosemount, including the <br />following tasks: <br />o Compiled published aquifer test data for the source aquifer <br />c Analyzed the data in AQTESOLV with the Hantush-Jacob leaky aquifer solution (T = <br />4,550 ft/day) <br />o Projected drawdown at nearby domestic wells and public water supply wells at <br />permitted capacity for 30 days <br />c Mapped the drawdown to show which private wells were at risk of interference <br />o Provided an SEH professional geologist on site during drilling to log geology and <br />coordinate with the contractor <br />SEH is now preparing the City's Wellhead Protection Plan update. <br />Project Details <br />CLIENT <br />City of Rosemount <br />YEAR COMPLETED <br />2025 <br />REFERENCE <br />Nick Egger, Public Works Director <br />651.322.2015 <br />nick.egger@rosemountmn.gov <br />KEY PERSONNEL <br />Chad Katzenberger <br />Taylor Thom <br />Mark Sherrill <br />Melanie Niday <br />SHORT ELLIOTT HENDRICKSON INC. <br />WELL SITING ASSESSMENT FOR MUNICIPAL WELLS #9 AND #10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.