Laserfiche WebLink
Task 7 will focus on securing the necessary permits to <br />construct new municipal wells, generally following the New <br />Municipal Public Water Supply Well Checklist published by <br />the MDH. During this task we will be in communication with <br />the MDH and DNR for permitting conditions. The subtasks <br />necessary to complete this effort generally include: <br />o Develop preliminary well site location map including <br />existing facility locations, utilities, and proximity to local <br />features impacting public water supply well location <br />o Verify well setback distances following MDH criteria <br />based on items located on preliminary well map <br />o Verify location of important topographic features <br />o Obtain Well Construction Preliminary Assessment from <br />the DNR <br />o Complete DNR new well application for modifications to <br />the Client's water appropriations permit using the DNR <br />MPARS system <br />o Confirm the DNR has the Client's approved DNR Water <br />Supply Plan (WSP) on file <br />The remainder of the permitting efforts will be completed <br />as part of the final design. <br />+/ Deliverables: <br />o Well location and planning maps (well design depths, <br />sizing, well setback verification) <br />o DNR Well Construction Preliminary Assessment <br />o DNR MPARS permit application <br />o Meeting agendas and minutes <br />Phase 2: Test Wells and <br />Aquifer Pumping Tests <br />Phase 2 starts after the City approves the sites <br />and the MnDNR responds to the Preliminary Well <br />Construction Assessment. <br />TASK 0 FINALIZE TEST HOLE <br />AND TEST WELL LOCATIONS <br />SEH will meet with City staff to set the final locations <br />and depths. We will confirm which City -owned or City - <br />controlled parcels are available for drilling. The City <br />will provide all right -of -access permits for the selected <br />locations. We will confirm the MnDNR position on future <br />appropriation before drilling starts. <br />SEH will: <br />o Confirm which City -owned or City -controlled parcels <br />are available for drilling at each recommended site <br />(The City will provide all right -of -access permits and <br />agreements needed for drilling and testing at the <br />selected locations) <br />o Set the final test well location on each parcel based on <br />property boundaries, known utilities, MDH isolation <br />distances, drill rig access, and space for a future <br />production well <br />o Set the target depth for each test well from the updated <br />aquifer maps, with the first test hole log used to confirm <br />the depth for the others <br />o Confirm the MnDNR position on future appropriation <br />for each site before drilling starts <br />o Stake each drilling location. The drilling contractor will <br />obtain utility locates <br />o Deliverables: Final location and depth table with a site <br />map for each test well. <br />TASK 0 CONSTRUCTION <br />SPECIFICATIONS <br />SEH will prepare specifications for test hole drilling, 6-inch <br />test well installation, and 72-hour aquifer pumping tests. <br />The specifications will follow Minnesota Rules Chapter <br />4725. This task will include the following: <br />o Specify drilling and construction to Minnesota <br />Rules 4725, including outer casing through the <br />unconsolidated material, inner casing seated in <br />bedrock with a grouted annulus, and open hole in the <br />Tunnel City-Wonewoc aquifer above the Eau Claire <br />Formation (Alternative methods that meet the rules will <br />be acceptable) <br />o Specify geologic sampling intervals, sample handling, <br />and core or cuttings storage <br />o Specify test pump capacity, discharge piping, <br />flow measurement, and water level access for the <br />pumping tests <br />o Specify discharge handling during development and <br />test pumping, including routing to storm sewer or <br />ground surface as approved by the City <br />o Confirm drilling needs, methods, and sampling criteria <br />with the drilling contractor before mobilization <br />V Deliverables: Test well and aquifer test <br />specifications and drawings, including the assumed well <br />construction detail. <br />SHORT ELLIOTT HENDRICKSON INC. <br />WELL SITING ASSESSMENT FOR MUNICIPAL WELLS #9 AND #10 <br />