Laserfiche WebLink
GENERAL ELEVATION NOTES <br />1. REVIEW ALL MANUFACTURER RECOMMNEDATIONS FOR INSTALLATION OF EXTEIOR MATERIAL AS <br />SCHEDULED <br />2. ALL SIGNAGE SHOWN FOR REFERENCE ONLY - PROVIDED BY OTHERS UNDER A DEFERRED <br />SUBMITTAL - PROVIDE POWER AS REQ, COORDINATE LOCATION WITH OWNER PRIOR TO ROUGH-IN <br />3. ALL EXTERIOR LIGHTING SHOWN FOR REFERENCE ONLY -REFER TO DESIGN-BUILD ELECTRICAL <br />DRAWINGS FOR ADD. INFO. - COORDINATE FINAL LOCATIONS WITH OWNER IN FIELD PRIOR TO <br />INSTALLATION <br />4. GC TO VERIFY THAT ALL ENTRANCE LANDINGS ARE FLUSH WITH FINISHED FLOOR <br />5. GC TO VERIFY THAT ALL PAVED SURFACES ADJACENT TO THE BUILDING SLOPE AWAY TO PROVIDE <br />POSITIVE DRAINAGE <br />6. PROVIDE FLASHING AT GRADE AND/OR PAVED SURFACES AS REQ, REFER TO SECTIONS FOR ADD <br />INFO <br />7. FINISHES TO MATCH EXISTING BUILDINGEXTERIOR HM PAINT <br />PT-1 <br />MANUF: SHERWIN WILLIAMS <br />COLOR: TRICORN BLACK <br />ROOF SYSTEM W. INSUL <br />EPDM-1 <br />MANUF TBD <br />COLOR: BLACK <br />THIN BRICK VENEER <br />BRK-1 <br />MANUF:GLEN GERY OR SIM <br />COLOR: ASPEN SHITE <br />COPING/FLASHING <br />MTL-1 <br />MANUF: PAC-CLAD OR SIM <br />COLOR: MATTE WHITE <br />ALUM W/ GLAZING <br />ALUM-B / GLZ-1 <br />MANUF: TBD <br />COLOR: ANNODIZED BLACK <br />EXTERIOR SPLIT FACE WALL <br />CMU-1 <br />MANUF: AMCON OR SIM <br />COLOR: ROCK FACE, COLOR TBD <br />LAP SIDING <br />SID-1 <br />MANUF: LP LAP SIDING 6" REVEAL <br />COLOR: SAND DUNES <br />EXTERIOR MATERIALS SPECIFICATIONS <br />EXTERIOR TRIM (WHITE) <br />TRM-1 <br />MANUF: LP OR SIM <br />COLOR: SNOWSCAPE WHITE <br />FABRIC AWNING (BLACK) <br />FAB-1 <br />MANUF: CUSTOM <br />COLOR: BLACK <br />EXT WINDOW -DOUBLE HUNG <br />WIN-# <br />MANUF: TBD <br />COLOR: BLACK <br />ABA1 <br />4"2' - 0"6' - 8"4' - 8"6' - 4"4' - 8"12' - 0"4' - 8"12' - 0"4' - 4"4" <br />57' - 4" <br />CMU-1 <br />ALUM <br />FAB-1 <br />BRK-1 <br />SID <br />TRM-1 <br />WIN <br />TRM-1 <br />TRM-1 <br />BUILDING ADDRESS NUMBERS <br />AS REQUIRED <br />BUILDING SIGNAGE <br />40"X66" DOUBLE HUNG <br />WINDOW, TYP <br />W1 <br />NORTH ELEV: 1,376 SF <br />• GLASS: 479 SF (34.8%) <br />• PREFINISHED SIDING: 458 SF (33.3%) <br />• SPLIT VENEER: 32 SF (2.3%) <br />• BRICK VENEER: 407 (29.6%) <br />ELEVATION MINUS GLASS: 1,376 - 479 = 897 SF <br />COMBINED VENEER: 439 SF / 897 SF = (48.9%) <br />NOTE: BRICK TO CONTINUE BEHIND <br />FABRIC AWNINGS AS REQUIRED (EXPOSED) <br />57' - 4" <br />FINISH FLOOR <br />100' -0" <br />SECOND LEVEL <br />112' -5 1/4" <br />T.O. PARAPET <br />124' -0" <br />B.O. JOIST <br />110' -4 1/2" <br />12 <br />B.O. TRUSS <br />120' -9 3/4" <br />12' - 0"5' - 6"15' - 6"6' - 10"3' - 4"3' - 6"3' - 4"3' - 6"3' - 4"4' - 0"4"2' - 8"3' - 0"4' - 4"6' - 4"5' - 0"6' - 4"11' - 0" <br />EAST ELEV: 2,392 SF <br />• GLASS: 631 SF (28.8%) <br />• PREFINISHED SIDING: 821 SF(44.6%) <br />• SPLIT VENEER: 568 SF (6.1%) <br />• BRICK VENEER: 372 SF (12.5%) <br />ELEVATION MINUS GLASS: 2,392 - 631 = 1,761 SF <br />COMBINED VENEER: 940 SF / 1,761 SF = (53.4%) <br />NOTE: BRICK TO CONTINUE BEHIND <br />FABRIC AWNINGS AS REQUIRED (EXPOSED) <br />FINISH FLOOR <br />100' -0" <br />SECOND LEVEL <br />112' -5 1/4" <br />T.O. PARAPET <br />124' -0" <br />B.O. JOIST <br />110' -4 1/2" <br />1 2 <br />3' <br /> <br />- <br /> <br />2 <br /> <br />1 <br />/ <br />4 <br />" <br />8' <br /> <br />- <br /> <br />4 <br /> <br />1 <br />/ <br />2 <br />" <br />2' <br /> <br />- <br /> <br />0 <br /> <br />3 <br />/ <br />4 <br />" <br />10 <br />' <br /> <br />- <br /> <br />4 <br /> <br />1 <br />/ <br />2 <br />" <br />B.O. TRUSS <br />120' -9 3/4" <br />99' - 8" <br />24 <br />' <br /> <br />- <br /> <br />0 <br />" <br />5 <br />EX03 <br />5 <br />EX03 <br />WEST ELEV: 2,392 SF <br />• GLASS: 708 SF (29.6%) <br />• PREFINISHED SIDING: 834 SF(34.9%) <br />• SPLIT VENEER: 159 SF (6.6%) <br />• BRICK VENEER: 691 SF (12.5%) <br />ELEVATION MINUS GLASS: 2,392 - 708 = 1,684 SF <br />COMBINED VENEER: 850 SF / 1,685 SF = (50.4%) <br />NOTE: BRICK TO CONTINUE BEHIND <br />FABRIC AWNINGS AS REQUIRED (EXPOSED) <br />FINISH FLOOR <br />100' -0" <br />SECOND LEVEL <br />112' -5 1/4" <br />T.O. PARAPET <br />124' -0" <br />B.O. JOIST <br />110' -4 1/2" <br />A BA1 <br />B.O. TRUSS <br />120' -9 3/4" <br />2' - 0"6' - 8"10' - 4"6' - 8"2' - 0"3' - 8"21' - 0"3' - 4"2' - 0" <br />PAINTED SIGN <br />SEE RENDERINGS <br />BRICK TO EXTEND <br />BEHIND AS NOTED <br />W2DOUBLE HUNG <br />WINDOWS MULLED <br />TOGETHER, TYP <br />METER BANK <br />SOUTH ELEV: 1,376 SF <br />• GLASS: 193 SF (14.0%) <br />• PREFINISHED SIDING: 474 SF(34.4%) <br />• SPLIT VENEER: 378 SF (27.5%) <br />• BRICK VENEER: 310 SF (22.5%) <br />• HM DOOR: 21 SF (1.2%) <br />ELEVATION MINUS GLASS: 1,376 - 193 = 1,183 SF <br />COMBINED VENEER: 688 SF / 1,183 SF = (58.2%) <br />RISER ACCESS, DOOR <br />MARKED AS NOTED <br />KNOX BOX TO BE <br />PROVIDED <br />NOTE: BRICK TO CONTINUE BEHIND <br />FABRIC AWNINGS AS REQUIRED (EXPOSED) <br />FINISH FLOOR <br />100' -0" <br />SECOND LEVEL <br />112' -5 1/4" <br />T.O. PARAPET <br />124' -0" <br />B.O. JOIST <br />110' -4 1/2" <br />A <br />B.O. TRUSS <br />120' -9 3/4" <br />ALUM STOREFRONT SYSTEM <br />AS SCHED <br />FABRIC AWNING WITH METAL FRAME, <br />SEE EXTERIOR ELEVATIONS <br />EXTERIOR LIGHTING <br />BEYOND -SEE ELEV <br />TYPICAL LAP SIDING EXTERIOR WALL <br />• EXTERIOR PREFINISHED CEMENT BD SIDING <br />• 2" ZIP SHEATHING SYSTEM, SEAMS TAPED <br />• 2X6 FRAMING <br />• R-21 CAVITY INSULATION <br />• 6 MIL VAPOR RETARDER <br />• 5/8" GYP BD <br />TYPICAL BRICK VENEER EXTERIOR WALL <br />• 1" THIN BRICK VENEER <br />• MORTAR BED W/ SCRATCH COAT <br />• GALVANIZED METAL LATH <br />• (2) LAYERS #15 FELT <br />• 2" ZIP SHEATHING SYSTEM, SEAMS TAPED <br />• 2X6 FRAMING <br />• R-21 CAVITY INSULATION <br />• 6 MIL VAPOR RETARDER <br />• 5/8" GYP BD <br />TYPICAL ROOF SYSTEM <br />• 60 MIL EPDM OR TPO ROOF SYSTEM, <br />MECHANICALLY FASTENED <br />• R-30 RIGID INSULATION <br />• 10 MIL VAPOR RETARDER <br />• 3/4" ROOF SHEATHING <br />• ENGINEERED ROOF TRUSSES <br />• 6 MIL VAPOR RETARDER <br />• 5/8" GYP BD <br />EXTERIOR DOUBLE-HUNG <br />WINDOW AS SCHED <br />TYPICAL FOUNDATION <br />• RIGID INSULATION, R-15 MIN <br />• REINF. CONC. FOUNDATION W/ STRIP <br />FOOTING, SEE STRUCT <br />Scale <br />Date <br />Drawn By <br />Checked By <br />Project Number <br />ISSUE DATE <br />7455 VILLAGE DRIVE, SUITE #110 <br />LINO LAKES, MN 55014 <br />763-553-7927 <br />WWW.TANDGARCH.COM <br />CITY STAMP AREA <br />PRELIMINARY <br />NOT FOR CONSTRUCTION <br />COPYRIGHT © 2026 THIELEN & GREEN, P.A. ALL RIGHTS RESERVED. <br />NO PART OF THIS PLAN MAY BE REPRODUCED, DISTRIBUTED, OR <br />TRANSMITTED IN ANY FORM WITHOUT PRIOR WRITTEN PERMISSION <br />FROM THIELEN & GREEN, P.A. <br />10 <br />/ <br />1 <br />9 <br />/ <br />2 <br />0 <br />2 <br />6 <br /> <br />1 <br />1 <br />: <br />5 <br />4 <br />: <br />3 <br />6 <br /> <br />P <br />M <br />As indicated <br />EX03 <br />CONCEPTUAL <br />ELEVATIONS <br />? <br />? <br />10/19/2026 <br />969_2026 <br />RA <br />M <br />S <br />E <br />Y <br />, <br /> <br />M <br />N <br />CONCEPTUAL DESIGN 3 <br />CONCEPTUAL DESIGN 4 <br />P&Z PRELM DECK REVIEW <br />P&Z SUBMITTAL <br />P&Z RESPONSE <br />P&Z RESPONSE #2 <br />08/21/2026 <br />08/23/2026 <br />09/07/2026 <br />09/11/2026 <br />10/06/2026 <br />10/19/2026 <br />EL <br />E <br />V <br />A <br />T <br />E <br /> <br />H <br />O <br />P <br />E <br />HO <br />U <br />S <br />E <br />1 : 721NORTH ELEVATION <br />1 : 722EAST ELEVATION <br />1 : 723WEST ELEVATION <br />1 : 724SOUTH ELEVATION <br />3/8" = 1'-0"5 TYP EXTERIOR WALL SECTION <br />REVISION SCHEDULE <br />NO. DESCRIPTION DATE