My WebLink
|
Help
|
About
|
Sign Out
Home
06/16/98
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Road and Bridge Committee
>
Agendas
>
1998
>
06/16/98
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2025 2:45:00 PM
Creation date
6/9/2003 2:00:35 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Road & Bridge Committee
Document Date
06/16/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAgE ~ 1 <br /> <br />UPDATE ON T.H. #47 STP PROJECT <br />(IMPROVEMENT PROJECT #98-14) <br />By: Steve Jankowski, City Engineer <br /> <br />Background: <br /> <br />The T.H. #47 STP Project was announced in February 1998. The City has retained SRF, Inc. to <br />prepare plans and specifications and necessary environmental documents, and Evergreen Land <br />Services, Inc. to perform the necessary land and right-of-way acquisition for this project. The <br />last progress report was made at the April 28,1998 Road and Bridge Committee meeting. Since <br />that report, the following significant project events have occurred: <br /> <br />On May 4, 1998, the City held a public hearing on the project at City Hall. A record of <br />meeting highlights is attached. <br /> <br />A Project Path Report has been prepared and submitted and accepted by MnDOT. This <br />report serves as a scoping document of the impact the project will have on the area and <br />the environment. <br /> <br />We have received comments on the project from the Anoka County Highway Department <br />and Paul and Kimberly Foss of the Willow Ridge subdivision. Both documents, which <br />are attached, have been sent to SRF, Inc. <br /> <br />We have received a letter from MnDOT dated June 2, 1998, advising the City that it is <br />now authorized to proceed with the environmental assessment and that property can now <br />be acquired under hardship or protective buys. <br /> <br />In addition to the T.H. #47 STP Project, the City has identified a number of additional projects <br />which ideally could be performed in conjunction with the T.H. #47 STP Project. one project <br />that would be critically involved with the T.H. #47 Project is the development of Sunwood Drive <br />from Sunny Ponds to 149th Avenue. This project involves the construction of the fourth leg of <br />the integration. If not done concurrently with the T.H. #47 Project, additional costs can be <br />anticipated when the intersection is remodeled from three legs to four legs. Attached is a <br />proposal from SRF, Inc. to incorporate this work with the T.H. #47 plans and specifications. <br />Many of the work tasks are similar to those being performed for the highway project such as <br />wetland delineation, soil boring, and surveying functions. A separate bid schedule could be <br />included with the T.H. #47 Project to avoid many of the overhead costs such as bid document <br />preparation, solicitation, and advertisement. The cost of this work is estimated at $31,000. <br /> <br />Finally, a revised project cost estimate was requested following the public hearing because <br />additional properties were identified for acquisition after the preliminary design was prepared. A <br />copy of this estimate will be presented at the meeting. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.