Laserfiche WebLink
CITY OF RAMSEY <br />CAPITAL IMPROVEMENT/CAPITAL OUTLAY PLAN <br />1994 - 1998 <br />Enclosed is the Ramsey Capital Improvements/Capital Outlay Plan (CIP) for the years 1994 <br />- 1998. It has been prepared in an attempt to anticipate major capital expenditures in <br />advance of the year in which they are budget requests. Further, several projects may <br />interrelate or require other improvements prior to initiation which would cause delays <br />without prior planning. Additionally, projects may require budgeting over several years or <br />receipt of funds from other sources (i.e. grants) requiring planning completion prior to the <br />funding year. Finally, the plan enables a snapshot of the identified capital needs of the <br />community allowing for continual prioritization of these needs. <br />Approval of the CIP by Council does not authorize spending, or initiation, of a given <br />project. It does, however, provide a guide for the community for a whole array of private <br />and public decision making impacted by public capital expenditures. Therefore, the CIP <br />should receive ratification only if the Council perceives actions contemplated .within the <br />plan as reasonable and planned within justified time frames. <br />The CIP is not intended to provide for precise budgeting. Capital costs are projected as <br />estimates. Upon each update of the plan, deletions, additions, delays or other revisions <br />may occur, reflecting changing community needs. <br />The enclosed plan is divided into two parts. First are the capital improvements which are <br />improvements to land (streets, parks, utilities and buildings). This plan shows <br />$11,186,675 in improvements with revenues projected from nine funding sources. <br />Improvements from the General Fund ($3,335,000) are those requiring referendum or <br />similar other authority resulting in listed projects being less than certain. The other funding <br />sources (except for intergovernmental revenue - grant funds) have an increased stability <br />over the general fund projects. <br />The Capital Outlay plan is limited to rolling stock (cars, trucks, heavy equipment). The <br />existing stock is shown with a value of $1,551,000. Projected replacements or new <br />acquisitions are shown in 1993 dollars at $1,267,000 between the years 1993 and 2000. <br />Most of the expenditures (64.6%) are within Public Works with 17.8% planned for squad <br />replacement and 14.8% for fire apparatus. <br />The rotation for squads is shown at two each year with administrative vehicles and light <br />trucks on a ten-year replacement schedule. Two -ton trucks are on a thirteen -year schedule <br />with heavy equipment and fire apparatus at twenty and twenty-five years, respectively. <br />L <br />lJ <br />-93- <br />L� <br />